Mobile: 9370153239, 9370151769 M/s. CHANDAK CONSTRUCTIONS BuildeRs & DeVElopeRs * Main Square, Govt. Girls High School, Court Road, Camp, AMRAVATI- 444 602 Date : Ref. No. FORM 1 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account - Building/Wing wise) To, Date: 07/01/2024 Chandak Construction, Amravati Subject: Certificate of Percentage of Completion of Construction Workof: Chandak Towerhaving MahaRERA No.P50300051204being developed by Chandak Constructionas on (October 2023 to December 2023) Sir, 1Shashank. R. Chandak have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction work of Chandak TowerhavingMahaRERA No. P50300051204. Based on Site Inspection, with respect to Layout/each of the Building / Wing of the aforesaid Real Estate Project. Icertify that as on the date of this certificate, the Percentage of Work done for each of the building / Wing of the Rea! Estate Project under MahaRERA is as per Table Aherein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B, Table-A Layout/Building/Wing Number(To be prepared separately for each Building /Wing of the Project) SrNo Tasks / Activity Percentage of Actual Work Done (1) (2) (As on date of the Certificate) 100 1 Excavation Basements(if any) Number of Podiums (if any) 4 Plinth 100 5 Stilt Floor 6 slabs of super structure 54 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doorsand Windows to each of the Flat/Premises Sanitary Fittings within the Flat/Premises. Staircases, Lifts Wells and Lobbies at each Floor level 54 connecting Staircases and Lifts, Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, completionof terrace with the waterproofing of the building. 11 Installation of lifts, water pumps, Fire Fighting Fittings andEquipment as per CFO NOC, Electrical fittings toCommon Areas, electro, mechanical equipment, Compliance toconditions of environment /CRZ NOC,Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE -B Common Areas (Internal and External Development Works) in respect of the Registered Phase/ Project Number S. No. Common Roads and Facilities, Amenities Proposed Percentage of Work Details (Yes/No) done 1 Internal Roads & Foothpaths Yes 2 Water Supply Yes m Sewerage (chamber, sewage lines), Yes Storm Water Drains Storm Water Drains Yes 5 Landscaping & Tree Planting NO 6 Street Lighting No 7 Community Building No Treatment and disposalof sewage NO 0 and sullage water SolidWaste management &Disposal NO 0 10 Water conservation, Rain water Yes 0 harvesting 11 Energy management NO 0 12 Fire protection and fire safety Yes 0 requirements 13 Electrical meter room, sub-station, Yes receiving station 14 Other NO Yours Fajthfully SHASHANK.R.CHANDAK (License no - ML:-19356) Agreed and accepted by: M/s CHA aK CONSTRUGTI Name: ASPCER PARYIE Date: