Mobile :9370153239, 9370151769 M/s. CHANDAK CONSTRUCTIONS o BuildeRs & DeVElopeRs Main Square, Govt. Girls High School, Court Road, Camp, AMRAVATI -444 602 Ref. No. Date: FORM -2 ENGINEER'S CERTIFICATE of Money from (To be submitted at the time of Registration of Ongoing Project and for withdrawal Designated Account - Project wise) Date: 10/10/2023 To, The Chandak Construction, Amravati -444601. MahaRERA Subject: Certificate of Cost Incurred for Development of Chandak Towerhaving 2023 to Registration Number P50300051204being developed by Chandak Construction(As on July September 2023) Sir, IShashank. R. Chandak have undertaken assignment of certifying Estimated Cost for Chandak Towerhaving MahaRERA Registration NumberP50300051204being developed by Chandak Construction. 2. We have estimatedthe cost of Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the Drawings/plans made available tous for the project under reference by the Developer /Consultants. The Schedule of times and quantity required for the entire work as calculated by Shashank. R. Chandak Licensed Engineer appointed by Developer/ Engineer, the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertain/confirm the above analysis given to us. 3.We estimate Total Estimated Cost of completion of the aforesaid project under reference as Rs. 1,22,50,000/-(Total of Table Aand B) at the time of Registration. The estimated Total Cost of project is with reference to the Civil, MEP, and allied works required completion of the apartments and proportionate completion of internal &external works, as per specifications mentioned in 602 completion certificate agreement of sale and for the purpose of obtaining occupation certificate/ Corporation for the building(s)/Wing(s)/Layout/Plotted Development from the AmravatiMunicipal implemented. being the Planning Authority under whose jurisdiction the aforesaid project is being Estimated Cost 4. The Estimated Cost Incurred tilldate is calculated at Rs.34,89,970/-. The amount of Incurred is calculated on the basis of input materials/services used and unit cost of these items. 5. The Balance cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate completion of internal & external works,as per specifications mentioned in agreement of sale, of the Project is estimated at Rs 87,60,030/ 6. Icertify that the Cost of the Civil, MEP and allied work for the apartments andproportionate internal&externalworks, as per specifications mentioned in agreement of sale, of the aforesaid Project as completed onthe date of this certificate is as given in Table Aand BBelow. TABLE-A Building / Wing / Layout/ plotted Development bearing Number called Charndak Tower (to be prepared separately for each Building / Wing/Layout/Plotted Development of the Real Estate Project) Sr. No. Particulars Amounts 1 Total Estimated cost of the building as on date of Registration is Rs 1,22,50,000/ 2 Cost incurred as on date of certificate Rs 34,89,970/ 3 Work done in Percentage (as Percentage of the estimated cost) 28.49% Balance Cost to be Incurred** (Based on Estimated Cost) Rs87,60,030/ 5 Cost Incurred on Additional / Extra Items not included in the Estimated Cost (Table-C) Rs - TABLE -B Internal & External Development Works in Respect of the Registered Phase Sr. No. Particulars Amounts 1 Total Estimated cost of the Internal and External Development Works including amenities and Rs Facilities in the layout as on date of Registration is 2 Cost incurred as on date of certificate Rs 3 Work done in Percentage (as Percentage of the estimated cost) % 4 Balance Cost to be Incurred (Based on Estimated Cost) Rs 5 Cost Incurred on Additional / Extra ltems not included in the Estimated Cost (Table-C) Rs Yours Faithfully SHA6H ANK-R-HANDA K, (Licence No- M/L:- 19356) Local Authority License no. Agreed and acceptedby: CHAN)AK cONSTOGTIONI y Signature of Promoter PABTN EF YER Name: Date: Note: Project as per drawings approved 1. The scope of work is to complete Registered Real Estate sale. from time to time and as per specifications mentioned in agreement of by an independent 2. (*)Quantity survey can be done by office of Engineer or can be done Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer.in case of independent Quantity Surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked("). 3. (**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required/escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred/to be incurred. 4. Allcomponents of work with specifications are indicative and not exhaustive. 5. Please specify if there are any deviations/qualifications. Example:Any deviations in input material used from specifications in agreement of sale. Table C List of Extra/Additional /Deleted Items considered in cost (Which were not part of the original Estimate of Total Cost) Sr.No. List of Extra/Additional/Deleted Items Amount(In Rs) 2