Mobile : 9370153239, 9370151769 M/s. CHANDAK CONSTRUCTIONS BuildeRs & DeVelopERS Main Square, Govt. Girls High School, Court Road, Camp, AMRAVATI -444 602 Date : Ref. No. FORM 1 ARCHITECT'S CERTIFICATE Ongoing Project and for withdrawal of Money from (To be submitted at the time of Registration of Designated Account - Building/Wing wise) Date: 07/07/2023 To, Chandak Construction, Amravati Construction Work of: Chandak Tower having Subject: Certificate of Percentage of Completion of Constructionas on (April 2023 to June MahaRERA No.P50300051204being developed by Chandak 2023) Sir, Shashank. R. Chandak have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction work of Chandak Tower having MahaRERA No. P50300051204. Based on Site inspection, with respect to Layout/each of the Building / Wing of the aforesaid Real Estate Project. Icertify that as on the date of this certificate, the Percentage of Work done for each of the building / Wing of the Real Estate Project under MahaRERA 0s as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table-A for each Building /Wing of the Project) Layout/Building/Wing Number(To be prepared separately Percentage of ActualWorkDone Tasks/ Activity SrNo (As on date of the Certificate) (1) (2) 1 Excavation 2 Basements (if any) 3 Number of Podiums (if any) Plinth 5 Stilt Floor 6 slabs of super structure 7 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises Sanitary Fittings within the Flat/Premises. Staircases,Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0 completion of terrace with the waterproofing of the building. 11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC,Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE -B Works) in respect of the Registered Phase/ Common Areas (Internal and External Development Project Number Percentage of Work Details Common Roads and Facilities, Amenities Proposed S. No. done (Yes/No) 1 Internal Roads & Foothpaths Yes 2 Water Supply Yes Sewerage (chamber, sewage lines), Yes 0 3 Storm Water Drains 4 Storm Water Drains Yes 5 Landscaping & Tree Planting NO 6 Street Lighting No 7 Community Building No Treatment and disposal of sewage NO and sullage water 9 Solid Waste management &Disposal NO 10 Water conservation, Rain water Yes harvesting 11 Energy management NO 12 Fire protection and fire safety Yes 0 requirements 13 Electrical meter room, sub-station, Yes receiving station 14 Other NO Yours Faithfully SHASMANK . R- CAANDAK (License no - ML:-19356) Agreed and,asseptedkKietRUCTioR NuTAER PABTNE Date: