Annexure A FORM I Isee Regulation 3| ARAHIICI'SORIIEKCATE (To be subimitted at the time of Registration of Ongoing Project and tor withdrawal of Money from Designated Account) Date: 04/01/2025 To. Pravin SahebraoMahalle. FFS 27, Venus Plaza, Shegaon Naka Square, Amravati. 444604 Subject: Certificate or Percentage of Completion of Construction Work oflndrakshi Residency having Maha RERA Registration Numberps0300051825(Only Applicable after project Registration) being developed by Pravin SahebraoMahalle. Sir, IWeShraddha Sagane have undertaken assignment as Architect 'Licensed Surveyor of certifying Percentage of completion of Construction Work of Indrakshi Residency having Maha RERA Registration Number Ps0300051825(Only Applicable after project Registration. being developed by Pravin SahebraoMahalle. Based on Site Inspection, with respect to the aforesaid Real Estate Project .I certify that as on the date of this certificate, the Percentage of Work done for cach of the building of the Real Estate Project under Maha RERA is as per Table A herein below.The percentage of the work executed with respect toeach of the activity of the entire phase is detailed in Table B. TABLE-A Layout / Building / Wing Nunmber(to be prepared separately lor cach Layout 'Building / Wing of he Project) Sr. Tasks / Activity Percentage of Actual No. Work Done (2) (As on dale of the () Certificate) (3) 1. Excavation 100% 2 Basements (if any) 3. Podiums (if any) Plinth 100% 4. Stilt Floor 5. 6 Slabs of Super Structure 100% 7. Internal walls, Internal Plaster, Floorings, Doors and windows within 70% Flats/Premises 8 SanitaryFittings within the Flat/Premises 60% Staircases, 1lifts Wells and Lobbies at each Floor level Overhead and 70% Underground Water Tanks 10. External plumbing and external plaster, elevation, completion of 80% terraces with waterproofing of the Building Wing. 11. Installation of Lifts. water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to 79% entrance lobby;s. plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. IARLLR (omnon Arean (Intenal and I ternal Deve lopnent Wenkc)in repetof the Regrsterc l Phaxe Pryet Numbet St No Common areas and Iacthties I'pcd Detal I'ercentage of Actual Work Donc (2) (Ason datc of the (crtifcatc) No Intemal Roads AIoopaths Bore welIl 100. Water Supply SewerageChamber,lines, Septic Tank, Septic Tank 80 STP). Storm Water Drains No Tree planting 0 Landscaping &Tree Planting Street Lighting No Community Buildings No Treatment and disposal of sewage and No sullage water. No 0 SolidWaste management &Disposal 10 Water conservation RWH 00% Rain water harvesting No Energy mnanagement Iire protection and fire salety Tcqunenicnts 13 Yes Ilectrical meter oom, sub-station, tcccNing station, 14 Ohes (Option to Add mote). - m Yours Faithfully. Arch. Shraddha Sagane Signature & Name: Shraddha Sagane (B. Arch.) Lic. No. CA/2016/75503 (License No............ Agreed and Accepted by: PRAVIN S. MAHALLE BUILDERS & DEVEOPERS Signature of Promoters hop No. 27, Vinus Plaza, Name: Shegaon Naka, AMRAVATI Date:04/01/2025