FORM 1 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account - Building/Wing wise) To, Date: 07/01/2025 M/s Sky Point Builders, Amravati Subject: Certificate of Percentage of Completion of Construction Work of: Galaxy Heights having MahaRERA No. P50300051493 being developed by M/s Sky Point Builders as on (31/12/2024) Sir, / we ABDUL HASAB ABDUL HAKAM have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction work of Galaxy Heights having MahaRERA No. P50300051493. the aforesaid Real Based on Site Inspection, with respect to Layout/each of the Building/ Wing of Work done for each Estate Project. Icertify that as on the date of this certificate, the Percentage of per Table A herein below. of the building/Wing of the Real Estate Project under MahaRERA is as is The percentage of the work executed with respect to each of the activity of the entire phase detailed in Table B. Table-A the Project) Layout/Building/Wing Number (To be prepared separately for each Building /Wing of Percentage of Actual Work Done SrNo Tasks/ Activity (As on date of the Certificate) (1) (2) Excavation 69 1 2 Basements (if any) 3 Number of Podiums (if any) 36 4 Plinth 5 Stilt Floor 5 6 slabs of super structure 7 Internalwalls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 8 Sanitary Fittings within the Flat/Premises. Staircases, Lifts Nells and Lobbies at each Floor level 0 connecting Staircases and Lifts,Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terrace with the waterproofing of the building. 11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC,Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE- B Common Areas (Internal and External Development Works) in respect of the Registered Phase/ Project Number S. No. Common Roads and Facilities, Amenities Proposed Percentage of Work Details (Yes/No) done 1 Internal Roads & Foothpaths ) 2 Water Supply Yes 3 Sewerage (chamber, sewage lines), As per Storm Water Drains 4 Storm Water Drains 5 Landscaping &Tree Planting 6 Street Lighting Community Building 8 Treatment and disposal of sewage and sullage water No Solid Waste management & Disposal No As Pe 10 Water conservation, Rain water harvesting 11 Energy management 12 Fire protection and fire safety requirements 13 Electrical meter room, sub-station, receiving station 14 Other Yours Faithfully KAHEKASHA ARCHITETS AR ABDUI HASAB A60UAM& Signature & Name (IN BLOCK LETTERS) of L. S./ Architect (License no. ..) Agreed and accepted by: RTNER Signature of Promoter Name: Date: i/o1l202s