FORM -2 ENGINEER'S CERTIFICATE from submitted at the time of Registration of Ongoing Project and for withdrawal of Money (To be Project wise) Designated Account - Date: 10/07/2024 10/07/2023 To, The Sky Point Builders, Amravati -444601. MahaRERA Development of Galaxy Heights having Subject: Certificate of Cost Incurred for 2024 30/06/2023) developed by Sky Point Builders (As on Registration Number P50300051493 being Sir, WARUDKAR have undertaken assignment of certifying Estimated Cost for /we ANAND PRAVIN Sky Point having MahaRERA Registration Number P50300051493 being developed by Galaxy Heights Builders. the and Allied works required for completion of 2. We have estimated the cost of Civil, MEP external works of the project as per apartments and proportionate completion of internal & based on the estimated cost calculations are specifications mentioned in agreement of sale.Our reference by the Developer Drawings/ plans made available to us for the project under entire work as calculated by /Consultants. The Schedule of times and quantity required for the Quantity Surveyor* appointed by Developer/ Engineer, the developer, and the site assumption of the cost of material, labour and other inputs made by to us. inspection carried out by us to ascertain/confirm the above analysis given under reference as Rs. 3. We estimate Total Estimated Cost of completion of the aforesaid project Cost of 11,91,73,626/- (Totalof Table Aand B) at the time of Registration. The estimated Total project is with reference to the Civil, MEP, and allied works required completion of the apartments and proportionate completion of internal &external works, as per specifications mentioned in agreement of sale and for the purpose of obtaining occupation certificate /completion certificate for the building(s)/Wing(s)/Layout/Plotted Development from the Amravati Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is beingimplemented. 4. The Estimated Cost Incurred tilldate is calculated at Rs.0/-. The amount of Estimated Cost Incurred is calculated on the basis of input materials/services used and unit cost of these items. for completion of the and Allied works specitications cost of Completion of the Civil, MEP works, as per 5, The Balance internal & external completion of apartments and proportionate the Project is estimated at Rs 11,91,73,626/ mentioned in agreement of sale, of work for the apartments and proportionate the Civil, MEP and allied aforesaid 6. l certifythat the Cost of agreement of sale, of the specifications mentioned in internal & external works, as per Below. completed on the date of this certificate is as given in Table A and B Project as TABLE -A Number called Galaxy Heights (to be Building/ Wing / Layout/ plotted Development bearing Development of the Real Estate prepared separately for each Building / Wing/Layout/Plotted Project) Particulars Amounts Sr. No. Total Estimated cost of the building as on date of Registration is Rs 11,91,73,626/ 2 Cost incurred as on date of certificate Rs 0/ 3 Work done in Percentage (as Percentage of the estimated cost) 0% Balance Cost to be Incurred** (Based on Estimated Cost) Rs 11,91,73,626/ 5 Cost Incurred on Additional /Extra Items not included in the Estimated Cost (Table-C) Rs TABLE-B Internal & External Development WNorks in Respect of the Registered Phase Amounts Sr. No. Particulars 1 Total Estimated cost of the Internal and External Development Works including amenities and Rs Facilities in the layout as on date of Registration is 2 Cost incurred as on date of certificate Rs 3 Work done in Percentage % (as Percentage of the estimated cost) 4 Balance Cost to be Incurred (Based on Estimated Cost) Rs 5 Cost Incurred on Additional/Extra ltems not included in the Estimated Cost (Table-C) Rs Yours FaĆ­thfully Signature of Engineer (Licence No. ) Local Authority License no. Agreed and accepted by: SKY POiNTEULERS Signature of Promoter Name: shaileh PARTNER Date: tofot9s 4. Note: 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent Quantity Surveyor being appointed by Developer, the name has tobe mentionedat the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. (**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required/escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project willresult in amendment of the cost incurred/to be incurred. 4. Allcomponents of work with specifications are indicative and not exhaustive. 5. Please specify if there are any deviations/qualifications.Example: Any deviations in input material used from specifications in agreement of sale. Table C List of Extra/Additional /Deleted Items considered in cost (Which were not part of the original Estimate of TotalCost) Sr.No. List of Extra/Additional/Deleted Items Amount (In Rs) 1 2