FORM 1 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account - Building/Wing wise) To, Date: 07/10/2024 Sky Point Builders, Amravati Subject: Certificate of Percentage of Completionof Construction Work of: Galaxy Heights having MahaRERA No. P50300051493 being developed by Sky Point Builders as on (30/o9/2024) Sir, /we ABDUL HASAB ABDUL HAKAM have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction work of Galaxy Heights having MahaRERA No. P50300051493. Based on Site Inspection, with respect to Layout/each of the Building/ Wing of the aforesaid Real Estate Project. Icertify that as on the date of this certificate, the Percentage of Work done for each of the building / Wing of the Real Estate Project under MahaRERA is as per Table Aherein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table-A Layout/Building/Wing Number (To be prepared separately for each Building /Wing of the Project) SrNo Tasks /Activity Percentage of Actual Work Done (1) (2) (As on date of the Certificate) 1 Excavation 58 2 Basements (if any) 0 3 Number of Podiums (if any) 0 4 Plinth 21 5 Stilt Floor 6 slabs of super structure 0 within Internalwalls, Internal Plaster, Floorings the Flats/Premises,Doors and Windows to each of Flat/Premises Sanitary Fittings within the Flat/Premises. Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks 0 10 External plumbing and external plaster, elevation, completion of terrace with the waterproofing of the building. 11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment,Compliance to conditions of environment /CRZ NOc,Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wal and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Common Areas (Internal andExternal Development Works) in respect of the Registered Phase/ Project Number S. No. Common Roads and Facilities, Amenities Proposed Percentage of Work Details (Yes/No) done Internal Roads &Foothpaths 2 Water Supply 3 Sewerage (chamber, sewage lines), Storm Water Drains 4 Storm Water Drains 5 Landscaping & Tree Planting 6 Street Lighting 7 Community Building Treatment and disposal of sewage and sullage water Solid Waste management & Disposal 10 Water conservation, Rain water harvesting 11 Energy management 12 Fire protection and fire safety requirements 13 Electrical meter room, sub-station, receiving station 14 Other Yours Faithfully KAHEKASHA ARCHITECTS AR. ABDUL HASAB A6OUL HAZAM& M8838077512 Ihc00 Signature &Name (IN BLOCK LETTERS) of L. S./ Architect (License no. Agreed and accepted by: Signature of Promoter Name: slaeh Date: PÁRTNEP