FORM 1 ARCHITECT'S CERTIFICATE and for withdrawal of Money from of Ongoing Project the time of Registration Building/Wing wise) (To be submitted at Designated Account - Date:07/07/2024 To, Sky Point Builders, Amravati Heights having Completion of Construction Work of: Galaxy Subject: Certificate of Percentage of Builders as on (30/06/2024) MahaRERA No.PS0300051493 being developed by Sky Point Sir, Surveyor of HASAB ABDUL HAKAM have undertaken assignment as Architect/Licensed I/ we ABDUL MahaRERA No. Percentage of Completion of Construction work of Galaxy Heights having certifying P50300051493. of the Building /Wing of the aforesaid Real Based on Site Inspection, with respect to Layout/each certificate, the Percentage of Work done for each Estate Project. Icertify that as on the date of this MahaRERA is as per Table A herein below. of the building /Wing of the Real Estate Project under the activity of the entire phase is The percentage of the work executed with respect to each of detailed in Table B. Table-A Layout/Building/Wing Number (To be prepared separately for each Building Wing of the Project) SrNo Tasks / Activity Percentage of Actual Work Done (1) (2) (As on date of the Certificate) 1 Excavation 39 2 Basements (if any) 0 3 Number of Podiums (if any) Plinth 16 Stilt Floor 0 6 slabs of super structure Floorings within 7 Internal walls, Internal Plaster, each of the Flats/Premises, Doors and Windows to Flat/Premises Sanitary Fittings within the Flat/Premises. Floor level Staircases, Lifts Wells and Lobbies at each connecting Staircases and Lifts,Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terrace with the waterproofing of the building. Installation of lifts, water pumps, Fire Fighting 0 11 Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRZ NOC,Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Walland allother requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Registered Phase/ Common Areas (Internal and External Development Works) in respect of the Project Number CommonRoads and Facilities, Amenities Proposed Percentage of Work Details S. No. (Yes/No) done Internal Roads & Foothpaths 2 Water Supply 3 Sewerage (chamber, sewage lines), Storm Water Drains e8 4 Storm Water Drains o 5 Landscaping &Tree Planting 6 Street Lighting 7 Community Building 1 1 8 Treatment and disposal of sewage andsullage water 9 Solid Waste management & Disposal 10 Water conservation, Rain water harvesting 11 Energy management 1 12 Fire protection and fire safety requirements 13 Electrical meter room, sub-station, receiving station 14 Other Yours Faithfuly KAHEKASHA ARCHITECTS AR ABDUL HASAB ABJNAM6S Signature & Name (IN BLOCK LETTERS) of L. S. / Architect (License no... ... Agreed and accepted by: Signature of Promoter Name: (haule Roshr Date: ÁRGE