FORM 1 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Building/Wing wise) To, Date: 07/07/2023 Sky Point Builders, Amravati Subject: Certificate of Percentage of Completion of Construction Work of:Galaxy Heights having MahaRERA No. PS0300051493 being developed by Sky Point Builders as on (30/06/2023) Sir, / we ABDUL HASAB ABDUL HAKAM have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction work of Galaxy Heights having MahaRERA No. PS0300051493. Real Based on Site Inspection, with respect to Layout/each of the Building/ Wing of the aforesaid Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building/ Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table-A Layout/Building/Wing Number (To be prepared separately for each Building /Wing of the Project) SrNo Tasks / Activity Percentage of Actual Work Done (1) (2) (As on date of the Certificate) 1 Excavation 0 2 Basements (if any) 0 3 Number of Podiums (if any) Plinth nt2 Stilt Floor 6 slabs of super structure Internalwalls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 8 Sanitary Fittings within the Flat/Premises. 9 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks 10 External plumbing and external plaster,elevation, completion of terrace with the waterproofing of the building. 11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings toCommon Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC,Finishing to entrance lobby/s, plinthprotection, paving of areas appurtenant to Building/Wing,Compound Wall and allother requirements as may be required to Obtain Occupation /Completion Certificate TABLEB Common Areas (Internal and External Development Works) in respect of the Registered Phase/ Project Number S. No. Common Roads and Facilities, Amenities Proposed Percentage of Work Details (Yes/No) done 1 Internal Roads &Foothpaths No 2 Water Supply Pla 3 Sewerage (chamber, sewage lines), Storm Water Drains 4 Storm Water Drains Landscaping &Tree Planting 6 Street Lighting 2No 7 Community Building No Treatment and disposal of sewage and sullage water Solid Waste management & Disposal 10 Water conservation, Rain water harvesting 11 Plon Energy management No 12 Fire protection and fire safety requirements 13 Electrical meter room, sub-station, receiving station 14 Other Yours Faithfully KAHEKASHA ARCHITECIS AR ABDU HASAE AEbyHAAM i, Signature &Name (IN BLOCK LETTERS)of L. S./ Architect (License no. Agreed and accepted by: SKY POINT UILEORS PARTNER Signature of Promoter Name: Date: