FORM-2 (Sce Regulation 3) ENGINEER'S CERTIFICATE for withdrawal of moncy from Designated Account - Project time of Registration of Ongoing P'roject and (To be submitted at the Wise ) Date 07/01/2023 To. MANISHA BUILDERS AND DEVELOPERS, 202. Govind Tower, Vidyut Nagar,Walgaon road, VMV, Amravati. Certificate of Cost Incurred for Development of Jaee Residency-2 for Subject Construction of I building(s_1 Wing(s) of the Phase (MahaRERA Registration Number )_New Registration bearing C. N. No./CTS No./Survey No./ situated on the Plot 161/2 Final Plot No.12,13 demarcated by its boundaries (latitude and longitude of the end South 12 M WIDDE points) others house to the North Road in Layout_to the Taluka ROAD to the East Plot no.11B to the West of Division Amravati, Village Amravati, - - -Amravati, District - Amravati, PIN -444 603 admeasuring 522.87 sq.mts. area being developed by MANISHA BUILDERS AND DEVELOPERs. Ref MahaRERA Registration Number_ P50300034234 Sir I Miss. Ankita Haridasji Bhombe have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA. being JAEE RESIDENCY-2 Buildings Building(s)_1_ Wing(s) ofthe Phase situated on the plot bearing C. N. No./CTs No/ Survey No./161/2 Final Plot No,. 12,13 of Division Amravati. Village Amravati, Taluka Aamravati - District Amravati, PIN - 444 603 admeasuring 522.87 sq mts, area being developed by MANISHA BUILDERS AND DEVELOPERS. . Followingtechnical professionals are appointed by Owner/ Promoter: () M/s/ Shril Smt. Shraddha Sagane as L.S. / Architech; (i) Shri. Mahesh Nalmwar as Structural Consultant (i) Shri. Ravi Deshmukh as MEP Consultant (iv) Shri. Mahesh Vyawahare as Quantity Surveyor 4We have estimated the cost of the completion to obtain Occupation Certit+cate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cOst calculations are based on the Drawings/plants made available to us for the under project for the entire reference by the Developer and Consultants and the Schedule of items and quantity works as calculated by Mr. Mahesh Vyawahare quantity Surveyor appointed by labour and other inputs made by Developer/Engineer, and the assumption of the cost of material, developer, and the site inspection carried out by us. aforesaid .We estimate Total Estimated Cost of completion of the building(s) Phase I of the of project Phase I is with project under reference as Rs. 4,80,00,000/-. The estimated Total Cost the purpose ot reference to the Civil, MEP and allied works required to be completed for the Amravati obtaining occupation certificate l completion certificate for the building(s) from the aforesaid Municipal Corporation being the Planning Authority under whose jurisdiction project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 3,06,84,608/-. The amount of Estimated Cost Incured is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) Phase I of the subject project to obtain Occupation Certificate/Completion Certificate from _AMC_ (planning Authority) is estimated at Rs. 1,73,15,392/ 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A Below: TABLE A Building/ Wing bearing Number 1 Called Jaee Resideney-2 (to be prepared separately for each Building/Wing ofthe Real Estate Project) Sr. No. Particulars Amounts (1) (2) (3) Total Estimated cost of the building/wing as on Mar 2022 date of Registration is Rs. 4,80,00,000/- Cost incurred as on 31/12/2022 (Based on the Estimated 2 Rs. 3,06,84,608/ cost) Work done in percentage (as Percentage of the estimated cost) 64% 4 Balance Cost to be incurred (Based on Estimated Cost) Rs. 1,73,15,392/- Cost Incurred on Additional / Extra Items as on 07/01/2023 not included in the Estimated Cost (Annexure Rs. 0/ A) Yours Faithfully, Signature of Engineer. [ANKITA HARIDASJI BHOMBE] Bhm ANKITA BHOMBE B.E.(Civil) Consultng Civil Engineer Note I. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate / Completion Certificate. 2. ) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the na has to be mentioned at the place marked (*) and in case quantity are being calculated by oftice of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3 The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment ofthe cost incurred/ to be incurred. 5. All components of work with specifications are indicative and not exhaustive.