FORM-2 (Sce Regulation 3) ENGINEER'S CERTIFICATE o be submitted at the time of Registration of Ongoing Project and for withdrawal of money from Designated Account - Project wise) Date 17/09/2022 To. MANISHA BUILDERS AND DEVELOPERS, 202. Govind Tower, Vidyut Nagar,Walgaon road, VMV, Amravati. Subject: Certificate of Cost Incurred for Development of Jaee Residency-2 for Construction of Ibuilding(s) Wing(s) of the Phase (MahaRERA Registration New Registration situated on the Plot bearing C. N. No./CTS No./Survey No/ Number) demarcated by its boundaries (latitude and longitude of the end 161/2 Final Plot No.12,13 South 12 M WIDE points) others house to the North Road in Layout_ to the ROAD to the East Plot no.11B to the West of Division Amravati, Village - Amravati, Taluka -Amravati. District - Amravati, PIN-444 603 admeasuring 522.87 sq.mts. area being developed by MANISHA BUILDERS AND DEVELOPERS. Ref MahaRERA Registration Number P50300034234 Sir, I Miss. Ankita Haridasji Bhombe have undertaken assignment of certifying Estimated Cost for under MahaRERA, being JAEE the Subject Real Estate Project proposed to be registered Phase situated on the RESIDENCY-2 Buildings Building(s)_1 Wing(s) of the Final Plot No,. 12,13 of Division Amravati, plot bearing C. N. No./CTS No./ Survey No./161/2 - PIN 444 603 admeasuring 522.87 sq. Village Amravati, Taluka Aamravati District Amravati, - - - - BUILDERS AND DEVELOPERS. mts, area being developed by MANISHA Owner/ Promoter: 1. Following technical professionals are appointed by M/s/ Shri/ Smt. Shraddha Sagane as L.S. / Architech i) (i) Shri. Mahesh Nalmwar as Structural Consultant ii) Shri. Ravi Deshmukh as MEP Consultant (iv) Shri. Mahesh Vyawahare as Quantity Surveyor to obtain Occupation Certificate/ Completion 2. We have estimated the cost of the completion Our estimated of the Building(s) of the project. Certificate, of the Civil, MEP and Allied works, under made available to us for the project cost calculations are based on the Drawings/plants rererence by the Developer and Consultants and the Schedule of items and orkS as calculated by Mr. Mahesh quantity for the entire Developer/Engineer, and the Vyawahare quantity Surveyor appointed by assumption of thecost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) Phase I of the aforesaid project under reference as Rs. 4,80,00,000/-. The estimated Total Cost of project Phase I is with reterence to the Civil, MEP and allied works required to be completed for the pupose of obtaining occupation certificate completion certificate for the building(s) from the Amravati Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4 The Estimated Cost Incurred till date is calculated at Rs. 1,98,21,620/-. The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) Phase I of the subject project to obtain Occupation Certificate/ Completion Certificate from_AMC_ (planning Authority) is estimated at Rs. 2,81,78,380/- 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date ofthis certificate is as given in Table A Below TABLE A Building/Wing bearing Number 1 Called Jaee Residency-2 (to be prepared separately for each Building/ Wing of the Real Estate Project) Sr. No. Particulars Amounts () (2) 3) Total Estimated cost of the building/wing as on Mar 2022 Rs. 4,80,00,000/- date of Registration is Cost incurred as on 28/2/2022 (Based on the Estimated 2 Rs. 1,98.21,620/- cost) Work done in percentage (as Percentage of the estimated 41.29% cost) 4 Balance Cost to be incurred (Based on Estimated Cost) Rs. 2,81,78,380/- Cost Incurred on Additional / Extra Items as on 07/03/2022 not included in the Estimated Cost (Annexure Rs.0/ A) Yours Faithfuly Signature of Engineer. [ANKITA HARIDASJI BHOMBE] ANKITA BHOMBE B.E.(Civil) Consullng Civil Engineer Note: he Scope of work is to ume to time so complete entire Real Estate Project as per as to obtain Occupation drawings approved tro Certificate/Completion Certificate. uantity survey can be done by office of Engineer or can be done Quantity Surveyor, whose certificate of by an independent Engineer. In case of quantity calculated can be relied upon by the independent quantity being appointed by Developer, the name has to be mentioned at the place marked surveyor () and in case quantity are being calculated by office of the Engineer, the name of the person in the office of Engineer, who is responsible for quantity calculated should be mentioned at the place marked (*). 3. The estimated cost includes all out entire work. labour, material, equipment and machinery required to carry 4. As this is an estimated cost, any deviation in quantity required for Estate Project will result in amendment development of the Real of the cost incurred/ to be incurred. 5. All components of work with specifications are indicative and not exhaustive.