Annexure A FORM I |sce Regulation3| ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Projcct and tor withdrawal of Money fronm Designated Account) Date: 03/10/2023 To, The Manisha Builders and Developers, Flat No. 201, Govind Tower. Vidy ut Nagar, Amravati. 444604 Subject: Cerificate or Percentage of Completion of Construction Work of Jaee Residency 2 having Maha RERA Registration Number Ps0300034234 (Only Applicable after project Registration) being developed by Manisha Builders and Developers Sir, We ShraddhaSagane have undertaken assignment as Architect 'Licensed Surveyor of certifying Percentage of conpletion of Construction Work of Jaee Residency 2 having Maha RERA Registration Number PS0300034234 ( Only Applicable after project Registration. being developed by Manisha Builders and Developers Based on SiteInspection,with respect to the aforesaid Real Estate Project .lcertity that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project under MahaRERA is as per Table Aherein below. The percentage of the work exerted with respect to cach of the activity of the entire phase is detailed in Table B. Pojec) LayoutBuiltng/ I1. 10 9 7 No, Sr. other Any compliance Building/\Wing, requiredcntrance asterraces lnstallation Flats/Premises Staircases,Sanitary Underground Extemal Tanks Water Internal Slabs Floor Stilt any)(it Bascments PinthPodiums Excavation any)(it per of lo lobby;s. CFO plumbing with Fittings walls, Super activities. complete of \Wing to waterproong litts 1 Lifts. Internal Structure Compound conditionsNOC, Wells within Numbento plnth water project and and the Plaster, protection,Electrical Fla/Prenises Wall as ofpumps, external of ,Lobbies Acivity Tasks/ be envionment/CRZ per the Floorings, ppnd and Building Fire TABLE-A specifications plaster, (2) al paving tittings, at Fighting each seprately other Doors Wing. of clevation, Floor requirements mechanical Fitings and in areasNOC. for agreement level windows appurtenant and cach completion Overhcad Finishing equipment, Lavout as Equipment within ofmay Sal. and 'Building be to to of Perentageof (As \Wing / Certiicate) Work Done 100% 100% 100% 100% 100% 100% on 100% 100% (3) dale ot the of Actual the Number Common No.Sr. 14. 13. 12. 11. 10. 9 8. 7 4 6. 5 3. 2. 1. () Areas Electrical Solid Treatment Sewerage(Chamber,lines,SepticTank, (Internal Others Fire Waste Landscaping Planting &Tree Internal Roads Common areasand management protection water Rain conservation Energyharvesting Water / Community receiving Drains Storm Water and (Option station,meter sullage water. and Lighting Street requirements management Supply Water External disposal STP). room, (2) to and Add Buildings &Footpaths sub-station, fire of Development Facilities more). safety &Disposal sewage TABLE-B and Works) Tree Septic Tank RWH Bore well (Yes Proposed Yes No No No No No No in No planting No (3) respect No) / of (As Actual the Work Done Certificate) Percentage on ofRegistered 100% 100% 100% 100% 100% (4) date of the Phase Details / Project (5) i.209,af~a rete etaz, 03/10/2023 Date:Signature Promoter Name: of CA/2016/75503 Agreed Lic.No. ShraddhaSagane Arch. (License No. . Faithfully, Signature Yours and & Accepted Name Arch.)(B. :Shraddha ....) . by: Sagane