Annexure A FORM 1 see Regulation 31| ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and tor withdrawal of Money from Designated Account) Date: 7/01/2023 To. The Manisha Builders and Flat No. 201, Govind Tower, Developers, Vidyut Nagar, Amravati. 444604 Subject: Certificate or Percentage of Completion of Construction Work of Jaee Residency 2 having Maha RERA Registration Number P50300034234 (Only Applicable after project Registration) being developed by Manisha Builders and Developers Sir, /WeShraddha Sagane have undertaken assignment as Architect 'Licensed Surveyor of certifying Percentage of completion of Construction Work of Jaee Residency 2having Maha RERA Registration Number P50300034234 ( Only Applicable after project Registration. being developed by Manisha Builders and Developers Based on Site Inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under Maha RERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Layout/ Building/ Wing Number(to be prepared separately for each Layout 'Building/ Wing ofthe Project) Sr. Tasks/ Activity Percentage of Actual No. Work Done (2) (1) (As on dale of the Certificate) (3) 1. Excavation Excavation 90% Z. Basements (if any) 3. Podiums (if any) Plinth 100% 4. 5. Stilt Floor Slabs of Super Structure 90% 6. 7. Internal walls, Internal Plaster, Floorings, Doors and windows within 30% Flats/Premises 8. SanitaryFittings within the Flat/Premises 20% 9. and Staircases, 1 lifts Wells and ,Lobbies at each Floor level Overhead 30% Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of 10% terraces with waterproofing of the Building Wing. and Equipment 11. Installation of Lifts. water pumps, Fire Fighting Fittings CFO NOC, Electrical fittings, mechanical equipment, as per to 10% environment/CRZ NOC. Finishing compliance to conditions of entrance protection, paving of areas appurtenant to lobby;s. plinth as may be Building/Wing, Compound Wall and all other requirements of Sale. in agreement required to complete project as per specifications Any other activities. TABLE-B Common Areas (Internal and External Number Development Works) in respect of the Registered Phase / Project Sr. No. Common areas and Facilities Proposed Percentage of Details (Yes/No) Actual Work Done 0) (2) 3) (As on date of the Certificate) (5) (4) 1. No Internal Roads &Footpaths Boarwell 100% 2 Water Supply 3. Sewerage(Chamber,Iines, SepticTank, Septic Tank 5 STP). 4. Storm Water Drains No 5. Landscaping &Tree Planting Tree planting 6. Street Lighting No 0 7. Community Buildings No 8 Treatment and disposal of sewage and No 0 sullage water. 9. No 0 Solid Waste management &Disposal 10. Water conservation/ RWH 00% Rain water harvesting 11. No Energy management 12. Yes Fire protection and fire safety requirements 13. Yes 20% Electrical meter room, sub-station, rccciving station, 14 Others (Option to Add morc). Yours Faithfully, Signature & Name : Shraddha Sagane (License No. . ..) (8hgan Arch. Shraddha Sagane (B. Arch.) ic. No. CA/2016/75503 Agreed and Accepted by: Signature of Promoter Name: Name: t tratd Date: F r .2o9,7nfaa ziaz, faga rer, 377TErt-8*6%04