Annexure A FORM 1 see Regulation 31| ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and tor withdrawal of Money from Designated Account) Date: 17/09/2022 To. The Manisha Builders and Developers, Flat No. 201, Govind Tower, Vidyut Nagar, Amravati, 444604 Subject: Certificate or Percentage of Completion of Construction Work of Jaee Residency 2 having Maha RERA Registration Number P50300034234 (Only Applicable after project Registration) being developed by Manisha Builders and Developers Sir, IWeShraddha Sagane have undertaken assignment as Architect 'Licensed Surveyor of certifying Percentage of completion of Construction Work of Jaee Residency 2 having Maha RERA Registration Number P50300034234 ( Only Applicable after project Registration. beingg developed by Manisha Builders and Developers Based on Site Inspection, with respect to Layout each of the Building/Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under Maha RERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phaseis detailed in Table B. TABLE-A Layout/ Building/ Wing Number(to be prepared separately for each Layout 'Building/ Wing ofthe Project) Sr. Tasks/ Activity Percentage of Actual No. Work Done (2) () (As on dale of the Certificate) (3) 1. Excavation Excavation 80% 2. Basements (if any) 3. Podiums (if any) Plinth 100% 4. 5. Stilt Floor Slabs of Super Structure O. 42.85% 7. Internal walls, Internal Plaster, Floorings, Doors and windows within 10% Flats/Premises 8. SanitaryFittings within the Flat/Premises 00% 9. Staircases, 1 lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks 20% 10. External plumbing and external plaster, elevation, completion of 00% terraces with waterproofing of the Building Wing. 11. Installation of Lifts. water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to 10% entrance plinth lobby;s. protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B Common Arcas (Internal and External Development Works) in respect of the Registered Phase / Project Number Common arcas and Facilities Proposed Details Sr. No. Percentage of (Yes/No) Actual Work Done (3) (1) (2) (As on date of the Certificate) (5) (4) No Internal Roads &Footpaths Boarwell 100% 2. Water Supply 3. Sewerage(Chamber,lines,SepticTank, Septic Tank 50% STP). 4. Storm Water Drains No Tree planting 0 Landscaping &Tree Planting 5. No 0 6. Street Lighting Community Buildings No 7. and 0 8. Treatment and disposal of sewage No sullage water. No &Disposal Solid Waste management RWH 00% Water conservation/ 10. Rain water harvesting No Energy management 11. Yes 12. Fire protection and fire safety requirements 13. Electrical meter room, sub-station, 20% receiving station, 14. Others (Option to Add more). Yours Faithfully, Signature & Name :Shraddha Sagane (License No. .... Arch. Shraddha Sago7 (E3. Arch Lic. No. CA/7016/75503 Agreed and Accepted by: Signature of Promoter Name: Name: Date Fee .o9,antaa ziaR,