FORM 1 [See Regulation 3] ARCHITECT’SCERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) For the period ended on 30th June, 2023 Date: 2nd July, 2023 To, M/s Paras Buildcon, A-2, Tulip Apartments, Behind Garde Motors, Rajapeth, Amravati-444605. Subject: Certificate of Percentage of Completion of Construction Work of CASA Grand having Maha RERA Registration Number P50300051685 being developed by M/s M/s Paras Buildcon. Sir, I, Sumit P. Kharalkar , have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of development Work of the Project "CASA Grand”, having Maha RERA Registration Number P50300051685 being developed by M/s M/s Paras Buildcon. Based on the Site Inspection, with respect to the Layout / each Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under Maha RERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. 2 TABLE-A Building /Wing Number 01(to be prepared separately for each Building /Wing of the Project) S. Tasks / Activity Percentage of Actual No. Work Done (As on date of the Certificate) (1) (2) (3) 1. Excavation 70% Only RCC 2. Basements (if any) 80 % Only RCC 3. Podiums (if any) Nil 4. Plinth 75% 5. Stilt Floor Nil 6. Slab of Super Structure Basement Slab, Ground Floor Slab 7. Internal Walls, Internal Plaster, Floorings, Doors, - windows within Flats / Premises 8. Sanitary Fittings within Flats / Premises - 9. Staircases, Lift Wells & Lobbies at each Floor Level - Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, - Completion of Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings - and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-B Common Areas (Internal & External Development Works) in respect of the Registered Phase / Project Number 3 S. Common Areas & Facilities Proposed Percentage of actual Work Details No. (Yes / Done NO) (As on date of Certificate) (1) (2) (3) (4) (5) 1. Internal Roads & Footpaths No - 2. Water Supply Yes - 3. Sewerage (Chamber, Lines, Septic Yes - Tank, STP) 4. Strom Water Drains No - 5. Landscaping & Tree Planting No - 6. Street Lighting No - 7. Community Buildings No - 8. Treatment & Disposal of Sewage No - and Sullage Water 9. Solid Waste Management & No - Disposal 10. Water Conservation / Rain Water Yes - Harvesting 11. Energy Management No - 12. Fire Protection & Fire Safety Yes - requirements 13. Electrical Meter Room, Sub- No - Station, Receiving Station 14. Others (Option to Add more) No - Yours faithfully, Signature & Name of Land Surveyor / Architect Ar. SUMIT KARALKAR License Number ( CA/2016/75409) Agreed & Accepted by: Signature of Promoter Name: Mr Sushil Loadha Date: 2nd July, 2023