FORM-2 (See Regulation 3) ENGINEER'S CERTIFICATE Date 24/01/2022 To, P.S. ASSOCIATES, FF-27, Venus Plaza, Shegao Square Amravati. Certificate of Cost Incurred for Development of MAHALAXMI APARTMENT8 Subject No. fbuildingls-I Wing(s) ofthe Phase of the project situated on the plot bearing .c. S. No./C.T.S. No./Survey No./ Final Plot No1 S.No. 4/2 demarcated by its boundaries (latitude and longitude of the end points) ROAD_ to the North OTHER LAYOUT to the South 30 M WIDE ROAD to the East OTHER LAYOUT_ to the West of Division Amravati,_Village - Amravati, Taluka -Amravati, District- Amravati, PIN - 444 604 admeasuring _474.75 sq.mtrs. area being developed by P.S. ASSOCIATES MahaRERA Registration Number_P 50300026192 Sir, I Miss. Pratiksha Anilrao Gurjar have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being MAHALAXMI APARTMENT 8_No. of Building(s) 1 Wing(s) of the Phase of the situated on the plot bearing C. S.. No./c.T.S. No./ Survey No./ Final Plot No,. _I S.No.4/2 demarcated by its boundaries(latitude and longitude of the end points)ROAD to the North OTHER LAYOUT to the south_30 M WIDE ROAD to the EastOTHER LAYOUT to the West of Division Amravati, Village - Amravati, Taluka Aamravati - District - Amravati, PIN - 444 604 admeasuring 474.75 sq. mtrs. area being developed by P.S.ASSPCIATES Maha Rera Registration Number-P50300026192 Following technical professionals are appointed by Owner / Promoter:- 0) M/s/ Shri/ Smt. Shraddha Sagane as L.S. / Architech (ii) Shri. Mahesh Nalmvar as Structural Consultant (ii) Shri. Ravi Deshmukh as MEP Consultant (iv) Shri. Mahesh Vyawahare as Quantity Surveyor 1. We have estimated the cost of the completion to obtain Occupation Certificate/ Certificate, of the Civil, MEP and Allied works, of the Completion Building(s) of the project. Our estimated cost calculations are based on the Drawings/plants made available to us for the project under for the entire reference by the Developer and Consultants and the Schedule of items and quantity by works as calculated by Mr. MaheshVyawahare quantity Surveyor appointed labour and other inputs made by Developer/ Engineer, and the assumption of the cost of material, developer, and the site inspection carried out by us. Phase I of the aforesaid W e estimate Total Estimated Cost of completion of the building(s) reference Rs. 2,52,25,500/-The estimated Total Cost project is with of project under as for the purpose of works required to be completed reference to the Civil, MEP and allied from the Amravati certificate for the building(s) obtaining occupation certificate l completion under whose jurisdiction the aforesaid the Planning Authority Municipal Corporation being project is being implemented. amount of Total calculated on the base of amount of Cost Incurred is Rs. 2,52,25,500/-. 3. The Estimated Cost. Phase I of Allied works of the Building(s) cost of Completion of the Civil, MEP and 4. The Balance Certificate from _AMC_ Completion obtain Occupation Certificate the subject project to is estimated at Rs. 00/- (planning Authority) on aforesaid Project as completed allied work for the of the Civil, MEP and 5. I certify that the Cost Table A Below: certificate is as given in the date of this TABLE-A MAHALAXMI APARTMENT 8 Number 1 Called Building/ Wing bearing Real Estate Project) for each Building/ Wing of the (to be prepared separately Amounts Particulars Sr. No. (3) (2) date of () of the building/wing as on Rs. 2,52,25,500/- Total Estimated cost Registration is Estimated 31/12/2021 (Based on the Rs. 2,52,25,500/- Cost incurred as on cost) Percentage of the estimated 100% Work done in percentage (as cost) Rs. 00/- on Estimated Cost) Balance Cost to be incurred (Based Additional/ Extra Items as on Cost Incurred on (Annexure Rs.0/ included in the Estimated Cost registration not A) Yours Faithfully, Signature of Engineer. [PRATIKSHA ANILRAO GURJAR] Pratiksa Gurjar B.E.(Civil) Consulting Givil Engineer Agreed And Accepted By Signature of Promoter Name: P. S. ASSOCIAT ES FF27, Vinus Plaza, Shegaon Naka, AMRAVATI. Date: Note from Real Estate Project as per drawings approved The scope of work is to complete entire Certificate. 1. Certificate/ Completion time to time so as to obtain Occupation an independent can be done by can be done by office of Engineer o r the 2. ) Quantity survey calculated can be relied upon by certificate of quantity Quantity Surveyor, whose appointed by Developer, the n a me quantity surveyor being calculated by Engineer. In case of independent marked and in c a s e quantity a r e being mentioned at the place (*) who is responsible for has to be in the office of Engineer, name of the person office of Engineer, the marked (*). should be mentioned at the place the quantity calculated and machinery required to carry estimated cost includes all labour, material, equipment 3. The out entire work. of the Real deviation in quantity required for development 4. As this is an estimated cost, any incurred. cost incurred/ to be Estate Project will result in amendment ofthe exhaustive. are indicative and not 5. All components of work with specifications