FORM-2 (See Regulation 3) ENGINEER'S CERTIFICATTE Date 23/1 1/2021 To, P.S. ASSOCIATES, FF-27, Venus Plaza, Shegao Square Amravati. Subject Certificate of Cost Incurred for Development of MAHALAXMI APARTMENT8 No. of Building (s/ 1Wings (s) of the_ Phase of the project situated on the plot bearing Cs. No. /C.T.S. No./ Survey No./Final plot no_1S.NO 4/2 demarcated by its boundaries (latitude and longitude of the end points) ROAD to the North OTHERS LAYOUT to the South_30 M WIDE ROAD to the East_OTHERS LAYOUTto the West of Division_AMRAVATI village_AMRAVATI taluka AMRAVATI District AMRAVATI PIN 444604 admeasuring_474.75 sq.mtrs. area being developed by P. S. ASSOCIATES MahaRERA Registration Number- P 50300026192 Sir, I Miss. Pratiksha Anilrao Gurjar have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being MAHALAXMI APARTMENT8 No. of Building (s)/ 1Wings (s) of the_ Phase of the project situated on the plot bearing C.S. No. /C.T.S. No./ Survey No./ Final plot no_1 S.NO 4/2 demarcated the North OTHERS by its boundaries (latitude and longitude of the end points) ROAD to LAYOUT to the South_30 M WIDE ROAD to the East_OTHERS LAYoUT to the West of Division AMRAVATI village_AMRAVATI taluka AMRAVATI District AMRAVATI PIN_444604 admeasuring ASsOCIATES MahaRERA Registration Number-P _474.75 sq.mtrs. area being developed by P. S. 50300026192 Owner/ Promoter: Following technical professionals are appointed by M/s/ Shri/ Smt. Shraddha Sagane as L.S. / Architech ; ) Consultant (ii) Shri. Mahesh nalmvar as Structural (ii) Shri. Ravi Deshmukh as MEP Consultant Shri. Mahesh Vyawahare as Quantity Surveyor (iv) to obtain Occupation Certit+cate/ Completion 1. We have estimated the cost of the completion Our estimated of the Building(s) of the project. Certificate, of the Civil, MEP and Allied works, the Drawings/plants made available to us for the project under Ost calculations are based on rererence by the Developer and Consultants and the Schedule of items and quantity for the entire w ork as calculated by Mr. Mahesh Vyawahare quantity Surveyor appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 2We estimate Total Estimated Cost of completion of the building(s) Phase I of the aforesaid project under reference as Rs. 2,35,00,000/-. The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate/ completion certificate for the building('s) from the Amravati Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 3. The amount of Cost Incurred is 2,35,00,000/- calculated on the base of amount of Total Estimated Cost. 4. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) Phase I of the subject project to obtain Occupation Certificate/ Completion Certificate from _AMC (planning Authority) is estimated at Rs. 00/- 5. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date ofthis certificate is as given in Table A Below: TABLE-A Building/Wing bearing Number 1 Called mahalaxmi plaza (to be prepared separately for each Building/Wing of the Real Estate Project) Sr. No. Particulars Amounts (1) (2) (3) Total Estimated cost of the building/wing as on date of Rs. 2,35,00,000,/ Registration is Cost incurred as on 23.11.2021 (Based on the Estimated Rs. 2,35,00,000/- 2 Cost) Work done in percentage (as Percentage of the estimated 3 100% cost) 4 Balance Cost to be incurred (Based on Estimated Cost) Rs. 00/- Cost Incurred on Additional/ Extra Items as on 5 registration not included in the Estimated Cost (Annexure Rs.0/- A) Yours Faithfully, Signature of Engineer. [PRATIKSHA ANILRAO GURJAR] c, PratiksIh Gurjar B.E.(Civil) Consulting Clvll Engineer Note The scope of work is to complete entire Real Estate Project as per drawings approved rom timeto time so as to obtain Occupation Certificate/ Completion Certificate. 2. () Quantity survey can be done by office of Engineer or can be done by an independent the Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the name Engineer. In case of independent quantity surveyor being appointed by Developer, has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. for development of the Real 4. As this is an estimated cost, any deviation in quantity required Estate Project will result in amendment of the cost incurred/ to be incurred. indicative and not exhaustive. 5. All components of work with specifications are