FORM-2 (See Regulation 3) ENGINEER'S CERTIFICATE Date 09/08/2021 To. P.S. ASSOCIATES Amravati. FF-27, Venus Plaza, Shegao Square 8 No. of of MAHALAXMI APARTMENT Certificate of Cost Incurred for Development Subject the project situated on the plot bearing C.S. No. Building (s)/ 1Wings (s) of the_ Phase of plot no._1 S.NO demarcated 4/2 by its boundaries /C.T.S. No/ Survey No./Final LAYOUT to the South_30 ROAD to the North OTHERS the end points) (latitude and longitude of village_AMRAVATI M WIDE ROAD to the East_OTHERS LAYOUT to the West of Division_AMRAVATI sq.mtrs. a r e a being PIN_444604 admeasuring_474.75 taluka AMRAVATI District AMRAVATI 50300026192 Registration Number- P MahaRERA developed by P. S. ASSOCIATES Sir, Estimated Cost for the have undertaken assignment of certifying I Miss. Pratiksha Anilrao Gurjar MAHALAXMI to be registered under MahaRERA, being Subject Real Estate Project proposed project situated on of the_ Phase of the APARTMENT 8 No. of Building (s)/ 1Wings (s) demarcated No. /C.T.S. No./ Survey No./ Final plot no._1 S.NO 4/2 the plot bearing C.S. points) ROAD to the North OTHERS its boundaries (latitude and longitude of the end by LAYOUT to the West of Division M WIDE ROAD to the East_OTHERS LAYOUT to the South_30 AMRAVATI PIN_444604 admeasuring taluka AMRAVATI District AMRAVATI villageAMRAVATI P. S. ASSOCIATES MahaRERA Registration Number-P _474.75 sq.mtrs. area being developed by 50300026192 Owner/ Promoter : Following technical professionals are appointed by M/s/ Shri/ Smt. Shraddha Sagane as L.S./Architech; i) ii) Shri. Mahesh nalmvar as Structural Consultant Shri. Ravi Deshmukh as MEP Consultant ii) (iv) Shri. Mahesh Vyawahare as Quantity Surveyor 1. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion of the project. Our estimated Certificate, of the Civil, MEP and Allied works, of the Building(s) cost caleulations are based on the Drawings/plants made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire works as calculated by Mr. Mahesh Vyawahare quantity Surveyor appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 2. We estimate Total Estimated Cost of completion of the building(s) Phase I of the aforesaid project under reference as Rs. 1,06,98,560/-. The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate/ completion certificate for the building(s) from the Amravati Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. The amount of Cost Incurred is 1,42,26,930/- calculated on the base of amount of Total 3. Estimated Cost. works of the Building(s) Phase I of 4. The Balance cost of Completion of the Civil, MEP and Allied the subject project to obtain Occupation Certificate/ Completion Certificate from _AMC_ (planning Authority) is estimated at Rs. 00/- work for the aforesaid Project as completed on 5. I certify that the Cost of the Civil, MEP and allied Below: the date of this certificate is as given in Table A TABLE-A Called mahalaxmi plaza Building/ Wing bearing Number 1 Real Estate Project) (to be prepared separately for each Building/ Wing ofthe Particulars Amounts Sr. No. (2) (3) (1) date of Total Estimated cost of the building/wing as on Rs. 1,06,98,560,/- Registration is Cost incurred as on 30.6.2021 (Based on the Estimated Rs. 1,42,26,930/- cost) of the estimated Work done in percentage (as Percentage 100% cost) Estimated Cost) Rs. 00/- 4 Balance Cost to be incurred (Based on Extra Items as on Cost Incurred on Additional Cost (Annexure Rs.0/- registration not included in the Estimated A) Yours Faithfully, Signature of Engineer. [PRATIKSHA ANILRAO GURJAR] CAdECL Pratikslh Gurjar B.E.(Civil) Consulting Clvil Engineer Note 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate / Completion Certificate. 2. )Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to bementioned at the place marked () and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 5. All components of work with specifications are indicative and not exhaustive.