ffi ll lXprd: Effg..lzoz+ W (To be submitted at the tirne of Registration of Ongoing Proiect and for withdrawal of Money from Designated Account) To, The Sankalo Builders and Develooers Shop No. 104. City Center complex. Radhanagar. Lane no.2. Amaravati. 444602. Subiect: Certificate of Percentage of Completion of Construction Work of 01 No. of Building(s) of the only Phase of the Proiect [newRegistration] situated on the Plot bearing C.N. No/CTS No. /Survey no./ plot no. 13, 14a. 14b. 15, Survey no. LBl/1/Ademarcated by its boundaries ( latitudeand longitude of the end points) to the North9m wide roadto the South adiacent plot no. 12a & l6atothe East 9m wide roadto the West 7.5m wide roadof Division:--------of village: -----------Mouie: Rahatgaontaluka: AmaravatiDisEictsAmaravati PIN:444602 admeasuring 940.79sq.mts. Area being developed by Sankalp Builders and Developers Sir, l/We Nord 360 Studiohave undertaken assignment as Architect / Licensed Surveyor of certifying percentage of completion of construction work of 01 No. of Buildingfs) of the onl]rPhase of the Project I new Registration] situated on the Plot bearing C.N. No/CTS No. /Survey no./ piot no; 13. 14a. 14b, 15. Survey no. 1,85/1/A demarcated by its boundaries ( latitude and longitude of the end points) to the North adjacent 9m wide roacl to the South adjacent plot no. 12a & 16a_to the East 9m wide road to the West 7.5m wide road of Division:--------of village: Mouje: Rahatgaon taluka: Amaravati District: Amaravati PIN: 444602 admeasuring 940.79sq.mts. Area being developed by Sankalp Builders and Develope.rs. r ARCHTTECTURE r INTERIOR r LANDSCALE r CML 1. Following technical professionals are appointed by Owner / Promoter:- (i) M/s/Shri/SmtNord 360 Studioas L.S. / Architect; [ii) M/s /Shri / Sm as Structural Consultant (iii) M/s /Shri / Smt__NA_as MEP Consultant (ivJ M/s /Shri / Smt_M_as Site Supervisor Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number New Registrationunder MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE . A Building Number - A Sr. Tasks /Activity Percentage of No. work done 1 Excavation 1.000/o 2 1 number of Basementfs) and Plinth L00o/o 3 x number of Podiums 00o/o 4 Stilt Floor / Parking B5o/o 5 7 number of Slabs of Super Structure 00o/o 6 Internal Walls, Internal Plaster, Floorings within Flats/Premises, Doors and 45o/o Windows to each of the Flat/Premises. 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 20o/o Flat/Premises. B Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and l0o/o Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, completion of terraces 00o/o with waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per 00o/o CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing Compound Wall and all other requirements as may be required to obtain 2 Occupation / Completion Certificate. TABLE. B Internal and External Development works in respect of the entire registered phase. s. Common areas and Facilities Proposed Percentage of Details No. (Yes/No) Work done 1 Internal Roads &Footpaths Yes 0o/o NA 2 Water Supply Yes 0o/o Bore well and pump installed 3 Sewerage [chamber, lines, Septic Tank STPJ Yes 0o/o As per plan 4 Storm Water Drains Yes 0o/o NA 5 Landscaping& Tree Planting Yes 0o/o NA 6 Street Lighting No NA NA 7 Community Buildings No NA NA B Treatment and disposal of sewage and sullage No NA NA water 9 Solid Waste management & Disposal. No NA 10 Water conservation, Rain water harvesting No 0o/o As per plan 1,1, Energy management No 0o/o NA L2 Fire protection and fire safety requirements Yes NA NA 13 Electrical meter room, sub-station, receiving Yes 0o/o As per plan station. t4 Others [Option to Add more) Yours Faithfully, ffiffiffim 3g* Stq.Ed$G Pffc$t Ar. Tejas Fati! Nord 360 Studio Ar. TejasPatil 4tr (Partner) z/=-'-