GHETAN SHANKARRAO SUNE (B.E.Civil.A.l.E..F.l.V.) MoB No. :- 9823646002 Amc.Rg. No. :-M & L 0852180009307032020 Ref. No. : -lV/NA/ELEC/A-1 8389i40350 *Planner, Office:- Shop No. 7 ,Ground Floor *Panel Valuer, Royal MuktaPalace, By-pass Road "R.C.C. Designer Amravati.444606 *lnteriors -. Panel valuer of JantaSahkari Bank Amravati. ** Panel valuer of Dr.PanjabraoDeshmukh Urban Co-Operative Bank ltd. Amravati. Engineer's Certificate Date:30/09/2024 To, TheDEEPRAJAM INF RASPACE LLP Through partner RAJEN PATIL 1'tFloor,Wardhekar Complex, Ashiyaad ColonySquare,Shegaon Road Amravati.- 444603 Subject : Certificate of Percentage of completion of Construction work ofDRClW, having Residential Project Vista lmperia, Building of project (New Registration ) being developed by DEEPRAJAM INFRASPACE LLP Through partner RA|EN PATIL Sir, 1.lAVe CHETAN SUNE have undertaken assignment of certifying Estimated cost for DR CITY having Residential Project Vista lmperia, Building of project (New Registration ) being developed by DEEPRAJAM INFRASPACE LLP Through partner RArEN FATIL 2.We have estimated the cost of Civil,MEP and Allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the drawings/plans made available to us for the project under reference by the DeveloperlConsultants. The schedule of items and quantity required for the entire work as calculated by CHETAN SUNE (Quantity Surueyor) appointed by Developer/Engineer, the assumption of the cost of material, labour and other inputs made by the developer, and the site inspection carried out by us to ascertain/confirm the above analysis given to us. 3.We estimate Total Estimated Cost of completion of the aforesaid project under reference at Rs-33,47,05,057 J-- flotal of Table A and B) at the time of registration. The estimated Total cost of project is with reference to the Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreement of sale and for the purpose of obtaining occupation certificate/completion certificate for the Buildings/ Wings/Layout/Plotted Development from the AMRAVATT MUNC|pAL CORPORATIONAMRAVATI.being the planning Authority under whose jurisdiction the aforesaid project is being implemented' 4. The estimated cost incurred till date 30/ag/24 is calculated at Rs' - 1,35'6 (Total of Table A and B).The amount of Estimated cost incurred is calculated on the basis of input materials/services used and unit cost of these items. 5.The balance cost of completion of the Civil, MEP and allied works required for completion of project as the apartments and proportionate completion of internal & external works of the per specifications mentioned in agreement of sale, of the Project is estimated at Rs. of Table A and B) cost of the Civil, MEP and allied works for the apartments and proportionate -30,42,47,518.00/--(Total 6.lcertify that the internal & external works, as per specifications mentioned in agreement of sale, of the aforesaid project as completed on the date of this certificate is as given in Table A and B below: BuildingAVing/Layout/Plotted Development bearing of Plot No. 1 bearing Survey Number 13 t 48 ,13 I sL,situated at sHEGAON Prg- NandgaonPeth, Taluka - Amravati, District - Amravati, Pin-444503.East Side - Survey No. 13 part, West Side -30M Wide road to Shegaon, North Side - Survey No. 13 part, South Side - Survey No. 14 POd, , (latitude and longitude of the end points) 20"57'57.51"N, 77"45'51.24"E to the North, 20"57',1g.18"N, 77"44'38.63"E to the West. 20"57'.14.12"N, 77'45'50.02"E to the South, 20'57'14.49'N, 77"45'52.t1"E to the East of Division, Prg- NandgaonPeth, Taluka - Amravati, District - Amravati, Pin-444503, admeasuring 13,362.64 Sq.M. Area being developed by DeepraiaminfraspaceLlP . (to be prepared separately for each Building /\ltling/Layout/Plotted Development of the Real Estate Project) TABLE A., Sr Particulars Amounts No. 1 Total Estimated cost of the buildings/wings as on date 31,78,12,518.00/- of Registration is 2 Cost incurred as on date of certificate 1,35,65,000.00 /- 3 Work done in Percentage 4.260 Yo (as Percentage of the estimated cost) 4 Balance Cost to be lncurred** 3A,42,47,518.00/- (Based on Estimated Cost) 5. Cost lncurred on Additional/Extra ltems not lncluded in the Estimated Cost (Table - C) TABLE B lnternal & External Development works in respect of the Registered Phase Sr. Particulars Amounts No. 1 Total Estimated cost of the internal and external 1,68,92,539.OA/- Development Works including amenities and facilities in the layout as on date of Registration is 2. Cost incurred as on date of certificate 0.00 3. Work done in Percentage (as Percentage of the 0.00 estimated cost) 4. Balance Cost to be lncurred** 1,68,92,539.40/- (Based on Estimated Cost) 5. Cost lncurred on Additional/Extra ltems not lncluded in the Estimated Cost (Table - C) Yours faithfully, Chetan Sune Pronner, voruer, [&i;iil1i;,J#'i,'*,r0, & N a nfu Fl-flhtlilif St}5l DtdQuf,m pood,e n g ne e r - S i g n a tu re AIIRAVATT (M) e8236{8002 i [Not LESS THAN saih;r;r1i'b}'qi* H;ld;i;; equivalcnt.as per Section 2(u) of the Act]Local Authority License No. (if applicable) - l")ii*it{;*.1';1, r:l !nlragri*;* L't-i' ,\'\ \ \ Ag .*ci l1 Signature of Promoter Name:DEEPRAJAM INFRASPACE LLP Through partner RajenPatil Date Note 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantlty Surveyor, whose certificate of quantity calculated can be relied upon by the engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked(*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of [ngineer, who is responsible for the quantity calculated should be mentioned at the place marked(*). 3" (**) Balance cost to be incurred (4) may vary from Difference between Total estimated cost(1) and Actual Cost incurred (2) due to deviation in quantity requiredi escalation of cost etc. As this is an estimateej cost, any deviation in quantity required for deveiopment of the Real Estate Project will result in amendrnent of the cost incurred/ to be incurred. 5.Ail components of work with specifications are indicative and not exhaustive. 6. Please specify if there are any deviations/quaiifications. Example : Any deviations in input material used from specifications in aoreement of sale. TABLE - C List of Extra/Additional/Deleted ltems considered in cost (which were not part of the original Estimate of Total Cost) Sr. No List of Extra/Additional/Deleted ltems Amount 1 2.