SHAILENDRA DESHMUKH & ASSOCIATES ARCHITECTS, INTERIOR DESIGNERS & GOVT. APPROVED VALUER . OFFICE: ..VRINDAVAN SANKUL', PANCHAVATI SQUARE, AMRAVATI.444603 . PH.NO iOFF.{0721 }2667233, MOB.9 423424013 FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) DATE 15t10t2024 To, DEEPRAJAM I NFRASPACE LLP, Through partner RAJEN PATIL 1't Floor, Wardhekar Complex, Ashiyad Colony Square, Shegaon Road, Amravati - 444603. Subject: Certificate of Percentage of Completion of Construction Work of D.R. Gitv having Residential Project Vista lmperia, Building(s) of the Project [P5O3O0O5O8B3] being developed by Deeprajam infraspace LLP Through partner Rajen patir. Sir I / We Shailendra Deshmukh have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of D.R. City Residential Project Vista lmperia having MahaRERA Registration Number [P50300050883]. Developed By Deeprajam infraspace LLP Through partner Rajen Patil. Based on Site lnspection, with respectto each of the BuildingA/t/ing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the building / Wing of the Real Estate Project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. -l Table A Building A//ing Number VISTA IMPERIA-(to be prepared separately for each Building A/Ving of the Project) Sr. Tasks /Activity Percentage of No work done Till 30t09t2024 1 Excavation 85% 2 1 (One) number of Basement(s) and 1(One) Plinth 70% 3 0 (zero) number of Podiums Nit 4 Stilt Floor 80% 5 Plinth Nit b 9(Nine)number of Slabs of Super Structure 5% 7 Internalwalls. I nternal Plaster, Floorings within Flats/premises, 0% Doors and Windows to each of the FlaUpremises I Sanitary Fittings with in the FlaVPremises, Electrical Fittings within 0% the FlaUPremises 9 Staircases, Lifts Wells and Lobbies at each Floor level connecting 5% Staircases and Lifts, Overhead and Underground Water Tanks 10 The external plumbing and external plaster, elevation, completion 0% of terraces with waterproofing of the Building/Wing, 11 lnstall ation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingAffing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE.B lnternal & External Development Works in Respect of the entire Registered phase S.No. Com mon areas and Facilities, Proposed Percentage of Details Amenities (Yes/No) Work done till 30t09t2024 1 lnternal Roads & Footpaths No NA NA 2 Water Supply Yoc 0% NIL 3 Sewerag e (chamber, lines, Septic Yes 0 a/o As per Plan Tank, STP) 4. Storm Water Drains Yes 0 o/o As per Plan 5 Land scaping & Tree Planting Yes 0% AT THE TIME OF COMPLITION OF PROJECT 6. Street Lighting Yes 0 o/o NIL 7 Community Buildings No 0 o/o NA 8 Tre atment and disposal of sewage Yes 0 o/o As per Plan and sullage water I Solid Waste management & Yes 0 o/o As per plan Disposal 10 Water conservation, Rain water Yes 0% At the time of harvesting completion of work 11 Energy management No 0 o/o NA 12 Fire protection and fire safety Yes 0 o/o At The time of requirement completion of work '13 Electri cal meter room, sub-station, Yes 0% As per the receiving station requirements of authority 14 Others ( Option to Add more) NA 0 o/o NA , ...1 ;,.# Yours Faithfully .eftSm'bfid By AR. SHAILEN I \. \ t ( r--*' i Reg. no. CA/9 For Reg. No. 932 ! ! iI