ml a a OFFICE: ..VRINDAVAN SANKUL', PANCHAVATI sQUARE, AMRAVATI-444603 PH.NO iOFF. (07 2t ll26 67 233. MOB. 9 423 42401 3 SHAILENDRA DESHMUKH & ASSOCIATES ARCHITECTS, INTERIOR DESIGNERS & GOVT. APPROVED VALUER FORM f [see Regulation 3] ARCHITECT'S GERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) DATE 22t04t2024 To, DEEPRAJAM INFRASPACE LLP, Through partner RAJEN PATIL 1"t Floor, Wardhekar Complex, Ashiyad Colony Square, Shegaon Road, Amravati - 444603. Subject : Gertificate of Percentage of Completion of Construction Work of D.R. Citv having Residential Project vista lmperia, Building(s) of the Project [p50300050883] being developed by Deeprajam infraspace LLp rhrough partner Rajen patil. Sir I / We Shailendra Deshmukh have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of D.R. Citv Residential project Vista lmperia having MahaRERA Registration Number [P5O3OOO5O883]. Developed By Deeprajam infraspace LLP Through partner Rajen patil. Based on Site lnspection, with respect to each of the BuildingMing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the percentage of Work done for each of the building / Wing of the Real Estate Project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. , )li Table A Building Ming Number VISTA IMPERIA.(to be prepared separately for I the Project) each Buitding Ming of I Sr. Tasks /Activity Percentage of No work done Till 31t03t2024 1 Excavation 80% 2 1 (One) number of Basement(s) and '1(One) Plinth 15% 3 0 (zero) number of Podiums Nil 4 Stilt Floor 0o/o 5 Plinth Nit 6 9 ( Nine ) number of Slabs of Super Structure 0% 7 lnternal walls, lnternal Plaster , Floorings with in Flats/Premises, 0% Doors and Windows to each of the FlaUpremises 8 Sanitary Fittings within th e FlaUPremises , Electrical Fittings within 0% the FlaUPremises 9 Staircases, Lifts Wells and Lobbies at each Floor level connecting 0% staircases and Lifts, overhead and Underground water Tanks 10 The external plumbing and external plaster, elevation, completion 0% of terraces with waterproofing of the BuildingMing, 11 lnstallation of lifts, water pumps, Fire Fig hting Fittings and Equipment as per cFo Noc, Erectricar fittings to common Areas, electro, mechanical equipment, comptiance to conditions of environment lcRZ Noc, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, compound wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE.B lnternal & External Development Works in Respect of the entire Registered phase S.No. Common areas and Facilities, Proposed Percentage of Details Amenities (Yes/No) Work done till 31103t2024 1 lnternal Roads & Footpaths No NA NA 2. Water Supply Yes 0% NIL 3 Sewerage (chamber, lines, Septic Yes 0% As per Plan Tank, STP) 4. Storm Water Drains Yes o% As per Plan 5. Landscaping & Tree Planting Yes 0% AT THE TIME OF COMPLITION OF PROJECT 6. Street Lighting Yes 0Yo NIL 7 Community Buildings No o% NA L Treatment and disposal of sewage Yes o% As per Plan and sullage water I Solid Waste management & Yes 0% As per plan Disposal 10 Water conservation, Rain water Yes 0% At the time of harvesting completion of work 11 Energy management No 0% NA 12. Fire protection and fire safety Yes 0% At The time of requirement completion of work 13. Electrical meter room, sub-station, Yes 0% As per the receiving station requirements of authority 14. Others ( Option to Add more) NA o% NA Yours Faithfully Agreed and Accepted By AR. SHAILENDRA Reg. no. CN97121932 For Deeprajam lnfraspace