CHARUL N. SARAF "CHANDRAYAN1 16, VISHNU NAGAR, NAGAR WATER TANK, B.£. CIVIL NEAR NEW SVWASTIK AMRAVAT! - 444605 CONSULTING ENGINEER AND CONTRACTOR OPP. AMC GARDEN. -9422161910 PH. -07212510098, CELL E-MAIL : charul.saraf@gmail.com FORM 1 ARCHITECT'S CERTIFICATE Ongoing Project and for withdrawal of Money from (To be submitted at the time of Registration of Designated Account- Building/Wing wise) Date:07/04/2024 To, ShriAmarnath Builders and Developers, Amravati Construction Work of: Chandanvadihaving Subject: Certificate of Percentage of Completion of Amarnath Builders And Developers as on MahaRERA No. P50300033920 being developed by Shri (31/03/2024) Sir, Architect/Licensed Surveyor of certifying ICharul N. Saraf have undertaken assignment as Chandanvadi having MahaRERA No. Percentage of Completion of Construction work of P50300033920. aforesaid Real Estate Project. Icertify Based on Site Inspection,with respect to of the Building of the done for each of the building of the that as on the date of this certificate, the Percentage of Work The percentage of the work Real Estate Project under MahaRERA is as per Table A herein below. detailed in Table B. executed with respect to each of the activity of the entire phase is Table-A Layout/Building/Wing Number (To be prepared separately for each Building Wing of the Project) Percentage of ActualWork Done SrNo Tasks / Activity (As on date of the Certificate) (1) (2) Excavation 100 2 Basements (if any) 100 3 Number of Podiums (if any) 100 100 4 Plinth 0 5 Stilt Floor 38 6 8slabs of super structure 15 within Internal walls, Internal Plaster, Floorings Flats/Premises, Doors and Windows to each of the Flat/Premises 0 8 Sanitary Fittings within the Flat/Premises. 9 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircasesand Lifts, Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terrace with the waterproofing of the building. 11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment,Compliance to conditions of environment /CRZ NOC,Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and allother requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Common Areas (Internal and External Development Works) in respect of the Registered Phase/ Project Number S. No. Common Roads and Facilities, Amenities Proposed Percentage of Work Details (Yes/No) done Internal Roads & Foothpaths No NA NA 2 Water Supply Yes 5 As per plan 3 Sewerage (chamber, sewage lines), Yes Storm Water Drains As per plan 4 Storm Water Drains No NA NA 5 Landscaping &Tree Planting No NA NA 6 Street Lighting No NA NA Community Building No NA NA Treatment and disposalof sewage No NA NA and sullage water Solid Waste management &Disposal No NA NA 10 Water conservation, Rain water Yes 0 As per plan harvesting 11 Energy management No NA NA 12 Fire protection and fire safety Yes As per plan requirements 13 Electrical meter room, sub-station, No NA NA receiving station 14 Other Yours Faithfully Signature &Name (IN BLOCK LETTERS) of L. S. / Architect (License no. Agreed and accepted by: CHARU!. N.B.6.SARAF Civil Signature of Promoter Consulting Engncr 3 Contractor Name: Date: Ms. Shi Amamath Bujagsd Develcpers