CHARUL N. SARAF "CHANDRAYANI" 16, VISHNUNAGAR, NAGAR WATER TANK. B.E. CIVIL NEARNEW SWASTIK 444605 AMRAVAT! - CONSULTINGENGINEER AND CONTRACTOR OPP. AMC GARDEN, 9422161910 PH. - 07212510098, CELL - E-MAIL: charul.saraf@gmail.com FORM 1 ARCHITECT'S CERTIFICATE Project and for withdrawalof Money from (To be submitted at the time of Registration of Ongoing Designated Account- Building/Wing wise) Date: 07/01/2024 To, Shri Amarnath Builders and Developers, Amravati Chandanvadi having Subject: Certificate of Percentage of Completion of Construction Work of: MahaRERA No. P50300033920 being developed by Shri Amarnath Builders And Developers as on (31/12/2023) Sir, ICharul N. Saraf have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction work of Chandanvadi haing MahaRERA No. P50300033920. Based on Site Inspection, with respect to of the Building of the aforesaid Real Estate Project. Icertify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table-A Layout/Building/Wing Number (To be prepared separately for each Building /Wing of the Project) SrNo Tasks/ Actlvity Percentage of Actual Work Done (1) (2) (As on date of the Certificate) 1 Excavation 100 2 Basements (if any) 100 3 Number of Podiums (if any) 100 100 4 Plinth 0 5 Stilt Floor slabs of super structure 22.5 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 8 Sanitary Fittings within the Flat/Premises. 100 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overheadand Underground Water Tanks 10 External plumbing and external plaster, elevation, completionof terrace with the waterproofing of the building. 11 Installationof lifts, water pumps,Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC,Finishing to entrance lobby/s, plinth protection, pavingof areas appurtenant to Building/Wing, Compound Wall and allother requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Common Areas (Internal and External Development Works) in respect of the Registered Phase/ Project Number S. No. Common Roads and Facilities, Amenities Proposed Percentage of Work Details (Yes/No) done 1 Internal Roads &Foothpaths No NA NA Water Supply Yes Asper plan 3 Sewerage (chamber, sewage lines), Yes As per plan Storm WNater Drains Storm Water Drains No NA NA 5 Landscaping &Tree Planting No NA NA No NA NA 6 Street Lighting No NA NA 7 Community Building No NA NA 8 Treatment and disposal of sewage and sullage water No NA NA Solid Waste management &Disposal 10 Water conservation, Rain water Yes As per plan harvesting 11 Energy management No NA NA 12 Fire protection and fire safety Yes As per plan requirements 13 Electrical meter room, sub-station, No NA NA receiving station 14 Other Yours Faithfully Signature Name (IN BLOCK LETTERS) of L.S./Architect (License no.........) CHAEN54RAF Agreed and accepted by: Signature of Promoter Ms. Shn Amamath Buikçers Ad Deveopers Name: Date: Partner