ANNEXURE A FORM – 2A *See Regulation 3A.+ ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor’s Certificate) (To be submitted at end of the Financial Year) Date: 31/08/2026 To, The Raj Associates, 159/1, 159/2, 160, 162, 164/2 at Badnera, Amravati, Amravati, 444701. QUALITY ASSURANCE CERTIFICATE (Certificate No. 06 for the year ending 2024 - 25) Subject: Certificate for quality material used and quality of construction and workmanship for the work of Raj Township having MahaRERA Registration Number P50300022183 being developed by Raj Associates. Sir, I/We Saqlain Shaikh have undertaken the assignment of supervision of this real estate project. Our Responsibility. To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and/or other relevant code of practice. The details of the quality are as follows: 1. Structural Design, Stability and Testing Sr Parameters Yes No Remarks No. 1. Whether soil investigations of the No site have been conducted before the structural design and soil parameters have been accounted for in the structural design/drawings? 2. Whether Structural Engineer has YES been appointed for the project? 3. Whether the inspection registers, YES site order book and quality control test registers are maintained at the site properly and endorsed by the Engineer-in-Charge? 4. Whether testing facilities to check No quality of material is available at site? 5. Whether the statuary provision for YES disaster resistance/earthquake resistant design have been incorporated, specially in case of multistoried construction? 6. Has suitable cognizance been taken No on demarcated flood lines and appropriate precautions taken for protecting the site from flooding considering local flooding issues? 2. Input Materials Sr Parameters Yes No Remarks No. 1. Whether the following building YES materials confirm to relevant IS/BS/NBC Code, or per Industry Standards? If yes, provide details: A. Cement, Concrete and YES Coarse Aggregate B. Steel and its alloy YES C. Electrical wire, fittings and YES accessories D. Plumbing and sanitary YES fittings 2. Whether regular tests of materials YES and construction products are being done from accredited labs also? If yes, details of such labs 3. Whether manufacturer test YES certificate for cement, steel, pipes etc. have been obtained and whether supply records are being maintained? 4. Whether suitable water is being used for construction? A. What is the source of water? Borwell B. Has water been tested and YES approved by Engineer-in- Charge before construction? C. Has water been tested NO Not Required subsequently as per requirement? 3. Quality of Workmanship Sr Parameters Yes No Remarks No. 1. Whether works of all the electrical YES wiring/ connections/ lift installation / other electrical installations have been carried out under authorized /registered electrical engineer and whether records of the same has been maintained? 2. Whether all related works of YES plumbing & sanitary including installation of water supply systems, drainage systems, sewage systems, sinks, toilets etc. have been carried out under authorized /registered plumbers / sanitary contractors and whether records of the same has been maintained? 3. Whether all the work is being YES carried out under supervision of experienced and skilled professional? Further, whether the workmanship and quality is satisfactory and up to the mark and the work is within the acceptable and permissible limits of deviations as per relevant Code of Practice? 4. Whether remedial measures are YES undertaken to prevent dampness and leakages? If yes, provide details 5. Whether safety precautions are YES undertaken during construction activities for all type of workers? 4. Miscellaneous Sr Parameters Yes No Remarks No. 1. Whether third party quality YES inspection is being carried out on site during/after completion of the works? If yes, provide details. 2. Whether anti-termite treatment YES has been undertaken for the soil? 3. Whether fire-fighting NO arrangements has been undertaken under supervision of fire consultant? 4. Whether proper signages have YES been installed on site/ completed building as per requirement? 5. Whether precautions are YES Placed green net undertaken to avoid air pollution at Surroundings during construction? Please and water pumps specify. when required 6. Whether records of all test reports NO / results have been properly kept in the prescribed formats and whether the same are available at site for viewing by allottees and to be handed over to the association of allottees? 7. Whether all relevant records YES Once assciation is including sanctioned building formed all the plans, utility drawings, various test relevant reports / results have been documents will be properly kept in the prescribed Provided formats to be handed over to the association of allottees? 8. Any innovative/ cost effective/ YES Once assciation is green technology has been used formed all the for improving quality/energy relevant efficiency? Please specify documents will be Provided Yours Faithfully, Agreed and Accepted By: ___________________ ______________________ Signature of Engineer Signature of Promoter Date: 31/08/2026 Date: 31/08/2026