FORM-2 (See Regulation 3) ENGINEER'S CERTIFICATE Date 24/01/2022 To, P.S. ASSOCIATES, FF-27, Venus Plaza, Shegao Square Amravati. Certificate of Cost Incurred for Development of MAHALAXMI PLAZA No.of Subject: building(s)/_1_ Wing(s) of the Phase of the project situated on the plot bearing. C. S.. No./C.T.S. No./Survey No./ Final Plot No27 S.No.34/2 demarcated by its boundaries (latitude and longitude of the end points) ROAD to the North PLOT NO to theSouth PLOT NO.28 to the East SERVICE LINE to the West 26PART PIN - 444 ofDivision Amravati, _Village Amravati, Taluka -Amravati, District Amravati, - 604 admeasuring_411.70 sq.mtrs. area being developed by P.S. ASSOCIATES MahaRERA Registration Number P50300023560 Sir, I Miss. Pratiksha Anilrao Gurjar have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being MAHALAXMI PLAZANo. of Building(sy Wing(s) of the Phase of the situated on the plot bearingC. S. No./C.T.S. No./ Survey No./ Final Plot No,. 27 S.No.34/2 demarcated by its boundaries(latitude and longitude ofthe end points)ROAD_ to the North Plot No.26 PART_to the south plot No. 28 to the East_ SERVICE LANE_to the West of Division Amravati, Village Amravati, Taluka - Aamravati - District- Amravati, PIN - 444 604 admeasuring 411.70 sq. mtrs. area being developed by P.S.ASSPCIATES Maha Rera Registration Number-P50300023560 Followingtechnical professionals are appointed by Owner/ Promoter (i) M/s/Shri/ Smt. Shraddha Sagane as L.S./ Architech; (ii) Shri. Mahesh Nalmvar as Structural Consultant (iii) Shri. Ravi Deshmukh as MEP Consultant (iv) Shri. Mahesh Vyawahare as Quantity Surveyor . We have estimated the cost of the completion to obtain Occupation Certificate/ Certificate, of the Civil, MEP and Allied Completion works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plants made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire works ascalculated by Mr. Mahesh Vyawahare quantity Surveyor appointed by Developer/ Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 2. We estimate Total Estimated Cost of completion of the building(s) PhaseI of the aforesaid project under reference as Rs._3,05,00,000/-_ The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purposeof obtaining occupation certificate / completion certificate for the building(s) from the Amravati Municipal Corporation being the Planning Authorityunder whose jurisdiction the aforesaid project is being implemented. amount of Estimated 3. The Estimated Cost lIncurred till date is calculated at Rs. 3,05,00,000/-. The Cost. Cost Incurred is calculated on the base of amount of Total Estimated 4 The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) Phase of I Certificate from _AMC_ the subject project to obtain Occupation Certificate / Completion (planning Authority) is estimated at Rs. 00/- for the aforesaid Project as completed on 5. I certify that the Cost of the Civil, MEP and allied work Below: the date of this certificate is as given in Table A TABLE-A MAHALAXMI PLAZA Building/Wing bearing Number 1 Called Real Estate Project) (to be prepared separately for each Building/ Wing ofthe Particulars Amounts Sr. No. () 2) (3) Total Estimated cost of the building/wing as on date of Rs. 3,05,00,000/ Registration is Cost incurred as on 31/12/2021 (Based on the Estimated Rs. 3,05,00,000/ 2 cost) Work done in percentage (as Percentage of the estimated 100% 3 cost 4 Balance Cost to be incurred (Based on Estimated Cost) Rs. 00/- Cost Incurred on Additional/ Extra Items as on not Rs.0/ includedin the Estimated Cost (Annexure A)_ Yours Faithfully. Signature of Engineer. [PRATIKSHA ANILRAO GURJAR] Pratiksla Gurjar B.E.(Civil) Consulting Civil Engineer Agreed And Accepted By Signature of Promoter Name: PS. ASsOCIAT ES FF27, Vinus Plaza, Shegaon Naka, AMRAVATI. Date Note: 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate/ Completion Certificate. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked ("). 3 The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment ofthe cost incurred/ to be incurred. 5. All components of work with specifications are indicative and not exhaustive