FORM-2 (See Regulation 3) ENGINEER'S CERTIFICATE Date 23/11/2021 To, P.S. ASSOCIATES, FF-27, Venus Plaza, Shegao Square Amravati. No. of Subject Certificate of Cost Incurred for Development of MAHALAXMI PLAZA_ situated on the plot bearing C.S. No. Building (s)/ 1_Wings (s) of the Phase of the project no._27 S.NO 34/2 demarcated by its /C.T.S. No./ Survey No./Final plot 26 PARTto the boundaries (latitude and longitude of the end points) ROAD_to the North PLOT NO South_PLOT NO 28 to the East _SERVICE LANE to the West of Division_AMRAVAT village admeasuring_411.70 sq.mtrs. AMRAVATI_taluka AMRAVATI District_AMRAVATI PIN_444604 MahaRERA Registration Number- P 50300023560 area being developed by P. S. ASSOCIATES Sir, Estimated Cost for the have undertaken assignment of certifying I Miss. Pratiksha Anilrao Gurjar MAHALAXMI PLAZA_ No. Subject Real Estate Project proposed to be registered under MahaRERA, being of the Phase of the project situated on the plot bearing of Building (s)/ 1_Wings (s) demarcated by its C.S. No./C.T.S. No./ Survey No./Final plot no._27 S.NO 34/2 to the boundaries (latitude and longitude of the end points) ROAD_to the North PLOT NO 26 PART_ to the West of Division_AMRAVAT_village South PLOT NO 28 to the East _SERVICE LANE AMRAVATI PIN_444604 admeasuring_411.70 sq.mtrs. AMRAVATI_taluka AMRAVATI District MahaRERA Registration Number- P 50300023560 area being developed by P. S. ASSOCIATES Following technical professionals are appointed by Owner/ Promoter- M/s/ Shri/ Smt. Shraddha Sagane as L.S. / Architech; (i) Consultant ii) Shri. Mahesh nalmvar as Structural (ii) Shri. Ravi Deshmukh as MEP Consultant Shri. Mahesh Vyawahare as Quantity Surveyor (iv) to obtain Occupation Certificate/ Completion We have estimated the cost of the completion estimated of the Building(s) of the project. Our Certificate, of the Civil, MEP and Allied works, under calculations are based on the Drawings/plants made available to us for the project cost reference by the Developer and Consu ltants and the Schedule of items and quantity for the entire works as calculated by Mr. Mahesh Vyawahare quantity Surveyor appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. Phase I of the aforesad W e estimate Total Estimated Cost of completion of the building(s) reference Total Cost of project is with project under reference as Rs. 3,05,00,000/- The estimated to the Civil, MEP and allied works required to be completed for the purpose of obtaining the building(s) from the Amravati Municipal OCcupation certificate / completion certificate for the aforesaid project is being Corporation being the Planning Authority under whose jurisdiction implemented. Rs. 3,05,00,000/- The amount of Estimated 3. The Estimated Cost Incurred till date is calculated at Total Estimated Cost. Cost Incurred is calculated on the base of amount of Phase I of MEP and Allied works of the Building(s) 4. The Balance cost of Completion of the Civil, Certificate from _AMC Certificate/ Completion the subject project to obtain Occupation (planning Authority) is estimated at Rs. 00/- aforesaid Project as completed on and allied work for the 5. I certify that the Cost of the Civil, MEP Below: certificate is as given in Table A the date of this TABLE A NumberI Called mahalaxmi plaza Building / Wing bearing Real Estate Project) for each Building/ Wing ofthe (to be prepared separately Amounts Particulars Sr. No. (3) (2) () the building/wing as on date of Rs. 3,05,00,000/- Total Estimated cost of Registration is Estimated 30.6.2021 (Based on the Rs. 3,05,00,000/- Cost incurred as on 2 cost) the estimated 100% Work done in percentage (as Percentage of 3 Rs. 00/- cost) Estimated Cost) incurred (Based on Balance Cost to be 4 Additional Extra ltems as on Cost Incurred on the Estimated Cost (Annexure Rs.0/ included in 5 registration not A) Yours Faithfully, Signature of Engineer. [PRATIKSHA ANILRAO GURJAR] Pratiksha Gurjar B,E.(Clvil) Consuitng Civll Engineer Note from as per drawings approved is to complete entire Real Estate Project n e Scope of work Certificate / Completion Certificate. ime to time so as to obtain Occupation can be done by an independent be done by office of Engineer or Qantity survey can calculated can be relied upon by the of quantity the name Surveyor, whose certificate Quantity appointed by Developer, being independent quantity surveyor case quantity are being calculated by Engimeer. In case of marked (*) andin for has to be mentioned at the place office of Engineer, who is responsible of the person in the office of Engineer, the name marked (*). mentioned at the place the calculated should be quantity to carry and machinery required labour, material, equipment 3. The estimated cost includes all out entire work. Real of the for development deviation in quantity required estimated cost, any / to be incurred. 4. As this is an of the cost incurred will result in amendment Estate Project exhaustive. are indicative and not work with specifications 5. All components of