FORM-2 (Sce Regulation 3) ENGINEER'S CERTIFICATE Date 09/08/2021 To, P.S. ASSOCIATES, Amravati. FF-27, Venus Plaza. Shegao Square of of MAHALAXMI PLAZA_ No. Certificate of Cost Incurred for Development Subject situated on the plot bearing C.S. No. Building (s)/ 1_Wings (s) of the Phase of the project demarcated by its plot no._27 S.NO 34/2 /C.T.S. No/ Survey No./Final PLOT NO 26 PARTto the boundaries (latitude and longitude of the end points) ROAD_to the North t o the West of Division_AMRAVAT_village South_ PLOT NO 28 to the East_SERVICE LANE AMRAVATI PIN_444604 admeasuring 411.70 sq.mtrs. AMRAVATI_taluka AMRAVATI District_ Number- P 50300023560 ASSOCIATES MahaRERA Registration area being developed by P. S. Sir, Estimated Cost for the have undertaken assignment of certifying I Miss. Pratiksha Anilrao Gurjar MAHALAXMI PLAZA_ No. to be registered under MahaRERA, being Subject Real Estate Project proposed situated on the plot bearing (s)/ 1_Wings (s) of the Phase of the project demarcated by its of Building No./Final plot no_27 S.NO 34/2 C.S. No./C.T.S. No./ Survey the end points) ROAD_ the North PLOT NO 26 PARTto to boundaries (latitude and longitude of the Division_AMRAVAT_village_ South_PLOT NO 28 to the East_SERVICE LANE t o the West of District_AMRAVATI _411.70 sq.mtrs. PIN_444604 admeasuring AMRAVATI_taluka AMRAVATI Number- P 50300023560 MahaRERA Registration area developed by P. S. ASOCIATES being Promoter are appointed by Owner/ Following technical professionals M/s/ Shril Smt. Shraddha Sagane as L.S./Architech; () Consultant (ii) Shri. Mahesh nalmvar as Structural (ii) Shri. Ravi Deshmukh as MEP Consultant (iv) Shri. Mahesh Vyawahare as Quantity Surveyor Certiticate/ Completion . W e have estimated the cost of the completion to obtain Occupation Our estimated the Building(s) of the project. Certificate, of the Civil, MEP and Allied works, of the project under calculations are based on the Drawings/plants made available to us for cost reference by the Developer and Consultants and the Schedule of items and quantity for the entire works as calculated by Mr. Mahesh Vyawahare quantity Surveyor appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 2. We estimate Total Estimated Cost of completion of the building(s) Phase I of the aforesaid Cost of project is with reference project under reference as Rs. 2,57,32,796/-. The estimated Total to the Civil, MEP and allied works required to be completed for the purpose of obtaining from the Amravati Municipal Occupation certificate / completion certificate for the building(s) is beingg whose jurisdiction the aforesaid project Corporation being the Planning Authority under implemented. amount of Estimated calculated at Rs. 2,79,20,000/- The 3. The Estimated Cost Incurred till date is amount of Total Estimated Cost. Cost Incurred is calculated on the base of Phase I of MEP and Allied works of the Building(s) 4. The Balance cost of Completion of the Civil, Completion Certificate from_AMC_ / the subject project to obtain Occupation Certificate (planning Authority) is estimated at Rs. 00/- on aforesaid Project as completed MEP and allied work for the 5. 1 certify that the Cost of the Civil, as given in Table A Below: the date of this certificate is TABLE- A Number 1 Called mahalaxmi plaza Building/ Wing bearing Real Estate Project) for each Building /Wing ofthe (to be prepared separately Amounts Particulars (8) Sr. No. (2) ) Total Estimated cost of the ilding/wing as on date of Rs. 2,57,32,796/- Registration is Estimated 30.6.2021 (Based on the Rs. 2,79,20,000/- Cost incurred as on 2 cost) estimated 100% Work done in percentage (as Percentage of the Rs. 00/- cost) on Estimated Cost) 4 Balance Cost to be incurred (Based Additional Extra Items as on Cost Incurred on Rs.0/ included in the Estimated Cost (Annexure registration not A) Yours Faithfully. Signature of Engineer [PRATIKSHA ANILRAO GURJAR] D. Pratiksha Gurjar B.E.(Clvil) Consulting Civil Engineer Culsilii ' -i5ileeĆ­ Note from The scope of work is to complete entire Real Estate Project as per drawings approved time to time so as to obtain Occupation Certificate/ Completion Certificate. . ) Quantity survey can be done by office of Engineer or can be done by an independent calculated can be relied upon by the Quantity Surveyor, whose certificate of quantity Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by for office of Engineer, who is responsible office of Engineer, the name of the person in the the quantity calculated should be mentioned at the place marked (*). and machinery required to carry 3. The estimated cost includes all labour, material, equipment out entire work. of the Real in quantity required for development 4. As this is an estimated cost, any deviation incurred. cost incurred/ to be Estate Project will result in amendment ofthe exhaustive. are indicative and not 5. All components of work with specifications