I STIBODHKT]MAR DHOKE M. Tech. (Structural Engineeting), ?h.D. (P) SAFE CONSULTANTS On o ffi ci u t P t m e I o.f',l urowtt i 7 I u ni t: i ltttl (- o rpora r i o t t License.\ o. STAI Hili/2023/APL/t.)5445 Structural Designers & Consulting Engineers ENG INEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project a1d for ruthdrawal of MoneY from Designated Account- Project uase) Date: '2910612023 To The Developers, t Shri. Chugaram L. Khatri (H.U.F.) At Sai nagar Amravati. Subject i - certificate of cost Incurred for Development of c.L. KHATRI's (s) Phase of the Proj ect Conitruction Work of I ST No. of Building(s) i A& B Wing of the I st icTS No. /Sun'ey No. / Final Plot No. JP503000193621 situated on the Plot beanng c.N. No :ZZZt pfnf of Division Amravati, village: -Arnravati. Taluka - Amravati, Distnct. - Amravati, pIN 444607 admeasuring Total plor are;5700.00 sq.mts & total proposed built-up area 6082.00 developed by Sq. rnts. Ard permissible pro3eit land for Built up I1799. 00 sq.mts, area being Shri. Chugar am L. Khatri (H.I-r.f.) at Sai nagar Amravati' Ref:-Maha-RERARegistrationNumber:-P50300019362 Sir. I/We Ar. Rajendra R Gattani have undertaken assignrnent of cenifuing Estimated Cost for the Sublect Real Estate Prolect proposed to be registered under Previous Maha-RERA, being Building(s)/A&BWing(s) of the ist Phase of the Project, situated on the plot bearing village C.N. No.iCTS No./Surv'.y Xo, / Frnal Plot No 32211 PAKI of Division Amravati Amravatr Taluka Arnravati District Amravati PIN 444607 admeasurtng Total plot area 5700.00 mts. And permissible project land for Built sq.mts & total proposed built-up area 6082.00 Sq. ,p ttZOe,00 sq.mts, Area berng developed by Shri. Chugaram L' Khatri at Sai nagar Amravati 1. Following technical professionals are appointed by Oimer,'?romoter: - i) M.siShniSrnt. Ar Rajendra R. Gattani as L.S. i Architect. ii) M.s/Shrr/Smt. Er. Subodh Dhoke as structural consultant. iii) M.s/Shri/Smt. Er Satish l\4ankar as Electrical consultant iv) N4.s/Shn/Smt. Er Akshay Rothe as Srte Supen'isor 2. We have estrmated the cost of the completion to obtain Occupation Certificate/Completion Certificate, of the Crvil, \tlEP and Allied works. of the building(s) of the project Our estimated cost calculattons are based on the Drauings plans made available to us for the project under reference by the developer and Consultants Schedule ofitem s and quantr6" t for the entire Address: 31, Ground Floor, AnagadNaga4 Amravati @ntact No: 8600900969, 7 7 2 706 70 47 Mail: subodhdhoke@ gma il. co m SUBODHKtTI'lAR DHOKE M. Tech. (Structurul Engineering), Ph.D. (P) SAFE CONSUI,TA}-.JT5 ()n o fti ci at P art e I o f'.) u rtnwt i 1 / t t t i c ipa I C o rytort tl i ot t r Structural Designers & Consulting Engineers l,icert.se .\ o. Sl AI'E,iiV202jlAPl.I )5445 work as calculated by quantity Sun'eyor appointed by developer Engineer. and the assumption of the cost of matenal" labor ard other inputs n-rade by developer, and the site inspection carried out by us rs Rs. 13,09,33,296.00/- 3. We estimate Total Estrmated Cost of completion of the buildrng(s) of the aforesaid project under reference as Rs. 13,09,33,296.00/- (Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and al[ed r.r,orks required to be completed for the purpose of obtaining occupatron certificate/completion certificate for the building(s) from the being the Planning Authority under rvhose jurisdiction the I aforesaid project rs being implemented. 4. The Estrmated Cost Incurred till date is calculated at Rs. 1"00,00,000/- (Total of Table A and B) the amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balarrce cost of Completion of the Civil. MEP and Allied works of the building(s) of the sublect pro.lect to obtain Occupation Certificate/Completion Certificate from (planning Authority) is estirnated at Rs. 12.A9;3"296.00/- ((Total of Table A and B). 6. I certrfy that the Cost of the Cir.il, MEP and allied vvork for the aforesa:d Project as completed on the date of thrs certificate is as srven in Table A and B below: - TABLE A Building/wing bearing Number A or called rving A&b o be for each buildin ln of the real estate ect Sr. Particulars Amount No Total Estrmated cost of the buildingr'wrng A & B Rs. 13,09,33,296.001- I as on date of resistration rs Cost incured as on (Based on Rs. 1,00,00,000/- 2 the estimated cost) (o.. 3 \[brk Done in percentage (As percentage of the .t ;o estirrated cost) Balance Cost to be incurred (based on Estimated Rs. 12,09,33,296.001- 4 Cost) Cost Incurred on AdditionaluErtra items as on Nil 5 not included in the Estrmated Cost (Annexure A) Address: 31, Ground Floor, AnagadNagar, Amravati C.iorfiact No: 860 09009 69, 7 7 2 | O 6 7 0 4 1 Mail: subodhdh oke@gmall. com STIBODH KT]]}IAR DHOKE *1. Tech. (Structural Erryineering), Ph,D. (P) SAFE CONSULTANTS ( )t r o fi c' i ct I P an e I a l'. I t n'ttv t tt i,\ I u t i t i 1ta I L- o rytoral i o t t t Structural Designers & Consulting Engineers l,icense,\ o. S'|AII;,R12023,\PL/t t541-i TABLE B o be ared for each buil ofthe real estate Pro ect Sr. Particulars Amount No Total estirnated cost of the internal and extemal development rnorks rncluding amenities and I Rs. 4,90,99,986.00/- facilities in the Iayout as on date of registration are.. 1 Cost incurred as on (Based on Nil L the estimated cost) Work Done in percentage (As percentage of the Nil Jr estimated cost) Balance Cost to be incurred (based on Estimated Nri I Cost) Cost Incurred on Additional/Exffa items as on Nil 5 not included rn the Estrmated Cost (Annerure A) Yours Faithfully a M sliBfl&r[ t*. U*en a* $k;nrlt Lh*"&T*?Ef*i"ifl: Signature of Engineer (License No- STATE/R/2 023 / APLI 05445) Er. Subodhkumar V. Dhoke Note: 1. 'fhe scope oluork is to complete entire Real Estate Project as per drasings approled liom timc- to tiure so as to obla in ()ccnpation Certrfi cate/Crlmpletion Certiflcate. 2. Quantin' surve\ can ire done br. office ol'Engineer rrr can be done br an independent quantin Sun-er or- u l.rose certificale of quantit\ calculated car.r be relied upon br the Er.rgineer. In case of indeprendenl quantih surve\'(lr being appointed bv Devel,.r1er- the name has to be rneuticrned at thr'place marked () and in case cl"ranlitr are being calculated br oftlce ol'Engineer. the name of the person in tl.re off ice of Engineer. u,llo is responsible ltrr 1l.re qr-rantin' calcuiated should be mentioned at the piace marked (*). 3. The estin.rated cost includes all latror ma1eria1. equipment and rnachinen recluired 10 carn' out entire ur,'rrk. 4. As this is ar.r eslin:rated cost. anv detiation in quantiti required for developn.renl of the real Estale Project l i1l result in arrendment of the cost incurred / 1o lt incurred. 5. Al1 components o1'n ork nith specificaliru are indicative and not erhaustii t'. Annesure A I-ist of ErtraiAdditional Ilems ereculed n ith Cost (u hich r\ ere not part of fie original l--stimate of Total Cosl Address: 31, Ground Floor, AnagadNagar, Amravati C.lontact No: 86009009 6 9, 7 7 2 7 0 6 7 O 4 7 lMail subodhdh oke@ gmail. co m