CONSI,'LTANTS PLOT iIO 44 S}lTl, IiIAGAR N4}TDAill,AiI, IIAGPITR -44tOOOO t g.rw..rkh..l.io!@grn ll.corrt f. eGoocttooS Date: A7"01.2023 To, AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA, AMRAVATI. Subject: Certificate of cost incurred for Development of AMBER PARK having Maha RERA Registration Number P50300024763 being developed by AMBER BUTLDERS & DEVELOPERS, THROUGII PARTNBRS SMT. SEBMA SANJAY RATHI & SHRI" PRAKASH S. KELA, AMRAVATT. Sir, 1. I Er. SAGAR WAIYKIIADE have undertaken assignment of certifoing Estimated cost for AMBERPARK having Maha RERA Registration Number P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, THROUGII PARTIIERS SMT. SEEMA SANJAY RATHI & SIIRI. PRAKASH S. KELA, AMRAVATI. 2. We have estimated the cost of the completion of the civil, MEP and Allied works required for completion of internal & external works of the project as per the specifications mentioned in agreement of Sale. Our estimated cost calculations are based on the drawings/plans made available to us for the project under reference by the Developer/Consultants. The Schedule of items and quantiry" required for the entire work as calculated by Er. Sagar Wankhade Quantify Surveyor appointed by Developer/Engineer. The assumption of the cost of material, labour and other inputs made by Developer and the site inspection carried out by us to ascertain/confirm the above analysis given by us. 3. We estimate Total Estirnated cost of cornpletion of the aforesaid project under reference at Ils.12,64,20,000.00 (Total of Table A and B) at the time of Registration. The estimated Total cost of project is with reference to the Civil, MEP and Allied Works required for completion of the apartments and proportionate completion of internal & eternal works. As per specifications mentioned in agreement of Sale and for the purpose of obtaining occupation/completion certificate for the building(s)/Wing(s)/Layout/Plotted Development from the Town Planning Department, Amravati Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The estimated cost incurred till 31.12.2022 is calculated at Rs. 4,65,18,418.25 (Total of Table A and B). The amount of Estimated Cost Incurred is calculated on the base of input materials/services used and unit cost of these items. SAG WANKHADE Consulting Structural Engineer (8.E. CtvtL, M.E. STRUCTURE) Engineering Council of lndia Reg.No.APE 10A074116 5. The Balance cost of completion of the Civil, MEP and Allied works for the completion of the apartments and proportionate completion of internal &, extemal works, as per specifications mentioned in agreement of Sale, of the Project is estimated at Rs. 7,99,01,581.75 (Total of Table A and B). 6. I clarify that the cost of the Civil, MEP and allied work for the apartments and proportionate internal & external works, as per specifications mentioned in agreement of Sale, of the aforesaid Project as completed on the date of this certificate is given in Table A and B below: TABLE A Buildinl Wing /Layout/Plotted Development bearing Number "$!EEB_[ff or called BUILDING NO.2 WING C & D (to be prepared separately for each B ui ld i n g/W ingl L ay out/ Plotted Devel opment of the Real Estate Proj ect) Sr. No. Particulars Amount Gn Rs.) 1 Total Estimated Cost of the buildingi wing/Layout/Plotted Development as on date I2,64,20.000.00 of Registration is 2 Cost incurred as on date of this certificate 4,65,18.418.25 J Work done in percentage 36.80% ( as percentage of the estimated cost) 4 Balance Cost to be Incurred 7,99.01,581.75 ( based on Estimated Cost ) 5 Cost lncurred on Additional/ Extra items not included in the Estimated Cost (Table C) NIL TABLE B Internal & External Development Works in Respect of the Registration Phase Sr. Parficular Amount No. I Total Estimated Cost of the Internal and External Development Works including 2.52.84,000.00 amenities and Facilities in the layout as on date of Registration is WANKHADE C_onsultin g Structu ral E n g ineer {_B.E CtVtL, M.E. SIRUCTURE) Engineering Council of tndia Reg.No.APEl000t4t16 2. Cost incurred as on date of certificate NIL n J Work done in percentage NIL ( as percentage of the estimated cost) 4. Balance Cost to be Incurred 2.52.84,000.00 ( based on Estimated Cost ) 5. Cost Incurred on Additional/ Extra items not NIL included in the Estimated Cost (Table C) Yours Faithtully, Er. WANKHADE WANKHADE SAG (Licence No. APE/00074116) if any Consulti n g Structural En g i ne-e.r (8.E. ClVlL, M.E. STR.LJCTURE) Lngineering Council of lndia Signature & Name of Engineer neg.tto.lRe100074116 Agreed and Accepted by: AMBER BUILDERS & DEVELOPERS Promoter's Signature & Name FOI Ai'iEo, er..,u-is A Utveigreto 4aut- ff*, 1) SMT. SEEMA SANJAY RATITT For Arlrirai Bu i, ii crs & Developers Ps \* .". (\ 2) SHRr. PRAKASTT S. KELA Date:07.4L.2023 Note: l. The scope of the work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of Sale. 2. (*) Quantity Survey can be done by office of the Engineer or can be done by an independent quantiry surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by off,rce of Engineer. The name of the person in the office of Engineer, who is responsible for the quantity calculated, should be mentioned at the place marked (*). 3. (**) Balance Cost to be incurred (4) may vary from Difference between Total Estimated Cost (l) and actual Cost incurred (2) due to deviation in quantity required I escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred/to be incurred 5. All Compon€nts of work with specifications are indicative and not exhaustive. 6. Please specifr if there are any deviations/qualifications. Example: Any Deviations in input material used from specifications in agreement ofSale. TABLE C List of Extra/Additional,IDeleted ltems considered in Cost (Which were not part of the original Estimate of the Total Cost) Sr. No. List of Extra.tAdditional/Deleted ltems Amount (Rs.) I ) R WANKHADE Consulting Structural Engineer (8.E. ClvtL, M.E. STRUCTURE) Engineering Council of lndia Reg.No.APE 100074116