PLOT IIO SHIY I|AOAII ]{A]|DA,]|VA]'., NAGPITR "-.l4OOOe ..g.rr.ntlr..Lol CDgrn.tl.com H- tcooGtaooS Date: 07.0I.2021 To, AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA, AMRAVATI. Subject: Certificate of cost incurred for Development of AMBER PARJ( having Maha RERA Registration Number P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, THROUG}I PARTNERS SMT. SEEMA SAIIJAY RATHI & SHRI. PRAKASH S. KELA, AIVIRAVATI. Sir, 1. I Er. SAGAR WANKHADE have undertaken assignment of certifring Estimated cost for AMBER PARK having Maha RERA Registration Number P503000247 63 being developed by AMBERBUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA, AMRAVATL 2. We have estimated the cost of the completion of the civil, MEP and Allied works required for completion of internal & external works of the project as per the specifications mentioned in agreement of Sale. Our estimated cost calculations are based on the drawingslplans made available to us for the project under reference by the Developer/Consultants. The Schedule of items and quantity rrquired for the entire work as calculated by Er. Sagar Wankhade Quantity Surveyor appointed by Developer/Engineer. The assumption of the cost of material, labour and other inputs made by Developer and the site inspection carried out by us to ascertain/confirm the above analysis given by us. 3. We estimate Total Estimated cost of completion of the aforesaid project under reference at Rs.12,64,20,000.00 (Total of Table A and B) at the time of Registration. The estimated Total cost of project is with reference to the Civil, MEP and Allied Works required for completion of the apartments and proportionate completion of intemal & eternal works. As per specifications mentioned in agreement of Sale and for the purpose of obtaining occupation/completion certificate for the building(s)/Wing(s)/LayouUPlotted Development from the Town Planning Department, Amravati Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The estimated cost incurred till 31.12.2020 is calculated at Rs. 90J4,135.00 (Total of Table A and B). The amount of Estimated Cost Incumed is calculated on the base of input materials/services used and unit cost of these items. SAG R WANKHADE Consulting Structural Engineer (8.E" ClvlL, M.E. STRUCTURE) Engin eering Gouncitof lndia Reg.No .APE/O 0074r'16 5. The Balance cost of completion of the Civil, MEP and Allied works for the completion of the apartments and proportionate completion of internal &, extemal works, as per specifications mentioned in agreement of Sale, of the Project is estirnaled at Rs. 11,73,85,865.00 (Total of Table A and B). 6. I clarify that the cost of the Civil, MEP and allied work for the apartments and proportionate internal & external works, as per specifications mentioned in agreement of Sale, of the aforesaid Project as completed on the date of this certificate is given in Table A and B below: TABLE A Buildingi Wing /Layout/Plotted Development bearing Number ooAlI{BER'EABg or called BUILDING NO.2 WING C & D (to be prepared separately for each B ui ld i n g/Wing/Layout/Plotted Deve lopmen t of the Real Estate Proj ect) Sr. No. Particulars Amount (In Rs.) 1 Total Estimated Cost of the building/ wing/Layout/Plotted Development as on date 12,64,20.000.00 of Registration is 2. Cost incurred as on date ofthis certificate 90.34.135.00 .,) Work done in percentage 7.150h ( as percentage of the estimated cost) 4. Balance Cost to be Incurred 11.73.85,865.00 ( based on Estimated Cost ) 5 Cost Incurred on Additionall Extra items not included in the Estimated Cost (Table C) NIL TABLE B Internal & External Development Works in Respect of the Registration Phase Sr. Particular Amount No. 1 Total Estimated Cost of the Internal and Extemal Development Works including 2.52.84,000.00 amenities and Facilities in the layout as on date of Registration is SA WANKHADE Consulting Structural Engineer (8.8. CrVrL, M.E. STRUCTURe) Engineering Council of lndia Reg.No.APEl00074t16 2. Cost incurred as on date of certificate NIL J Work done in percentage NIL ( as percentage ofthe estimated cost) 4. Balance Cost to be Incurred 2,52,84"040.00 ( based on Estimated Cost ) 5 Cost Incurred on Additionall Extra items not included in the Estimated Cost {Table C) NIL Yours Faithfully, Er. WANKHADE (Licence No. APE/00074/16) if an1,' *.Fe{ W&TdKHADE Consulting Structural Engineer (8.E. CtVtL. ",1"8. STRUCTURE) Signature & Name of Engineer Engineerin r)0,rncil of lndia Reg.No.AF !,^,:r(i/{ 6 Agreed and Accepted by: AMBER BUILDERS & DEVELOPERS Promoter's Signature & Name 4& ForAmbarBuilders & Developers Partner 1) SMT. SEEMA SANJAY RATHr rl;rttBL,il?*F$ , iri .,r"li.,l::"., .:,. ,:,.; :, .* P 3. \' 2) SHRr. PRAKASH S. KELA Date:07.01 .2021 Note: l. The scope of the work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of Sale. 2. (*) Quantity Survey can be done by office of the Engineer or can be done by an independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by oflice of Engineer. The name of the person in the office of Engineer, who is responsible for the quantity calculated, should be mentioned at the place marked (*). 3. (**) Balance Cost to be incurred (4) may vary from Difference between Total Estimated Cost (l) and actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any devialion in quantity required for development of the Real Estate Project will result in amendment of the cost incurred/to be incurred" 5. All Components of work with specifications are indicative and not exhaustive- 6. Please speci$ if there are any deviations/qualifications. Example: Any Deviations in input material used from specifications in agreement of Sale. TABLE C List of Extra/AdditionaVDeleted ltems considered in Cost (Which were not part of the original Estimate of the Total Cost) Sr. No. L ist of Extra/Additional/Deleted Items Arnount (Rs.) I 2. SA R WANKHAD E Cons ulting Structural Engineer (8.E. Ctvra, M.E STRUCfURE) Eng ineering Co trncil of lndia Req r{o.APE/00074/16