GONSIJLTANTS PLOT 1{O a4 SHIY llAOAB rtAttDAilvAtrt, NAGPI',R -44000C ..garw.lrfthr.Lot (ag[rall.€|lr H. aaoocasoos Date:07.01.2025 To, AIUBER BUTLDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA. AMRAVATI. Subject: Certificate of cost incumed for Development of AMBER PARI( having Maha RERA Registration Nurnber P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA, AMRAVATI. Sir. 1. I Er. SAGAR WANKI{ADE have undertaken assignment of certifying Estimated cost for AMBER PARK having Maha RERA Registration Number P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, THROUGII PARTNERS SMT. SBEMA SANJAY RATHI & SHRI. PRAKASH S. KELA, AMRAVATI. 2. We have estimated the cost of the completion of the civil, MEP and Allied works required for completion of internal & external works of the project as per the specifications mentioned in agreement of Sale. Our estimated cost calculations are based on the drarvings/plans made available to us for the project under reference by the Developer/Consultants. The Schedule of items and quantity required for the entire work as calculated by Er. Sagar Wankhade Quantity Surveyor appointed by Developer/Engineer. The assumption of the cost of material, labour and other inputs made by Developer and the site inspection carried out by us to ascertain/confirm the above analysis given by us. 3. We estimate Total Estimated cost of completion of the aforesaid project under reference at Rs. 12,64,20,000.00 (Total of Table A and B) at the time of Registration. The estimated Total cost of project is with reference to the Civil, MEP and Allied Works required for completion of the apartments and proportionate completion of internal & eternal works. As per specifications mentioned in agreement of Sale and for the purpose of obtaining occupation/completion certificate for the building(s)AMing(s)/Layout/Plotted Development from the Town Planning Department, Amravati Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The estimated cost incurred till 31.12.2024is calculated at Rs. 10,2686,001.25 (Total of Table A and B). The amount of Estimated Cost Incured is calculated on the base of input materials/services used and unit cost of these items. WANKHADE Consulting Structr:ra lEngineer (8.E. CIVIL, M.E. STR ucTUR.E) Engineerin g Council of lndia Reg No.APE/00024/{6 5. The Balance cost of completion of the Civil, MEP and Allied works for the completion of the apartments and proportionate completion of intemal & external works, as per specifications mentioned in agreement of Sale, ofthe Project is estimated a{ Rs. 2,37,23,998.75 (Total of Table A and B). 6. I clarify that the cost of the Civil, MEP and allied work for the apartments and proportionate internal & external works, as per specifications mentioned in agreement of Sale, of the aforesaid Project as completed on the date of this certificate is given in Table A and B below: TABLE A Building/ Wing /Layout{Plotted Development bearing Number "Al[EEB_t1\Rg or called BUILDING NO.2 WING C & D (to be prepared separately for each Bui d i nglW ingll- ay outl Plotted Deve opment o f the Real Estate Proj ect) I I Sr. No. Particulars Amount On Rs.) 1 Total Estimated Cost of the building/ wing/Layout/Plotted Development as on date 12,@,20,000.00 of Registration is ) Cost incurred as on date of this certificate 10,26,96"001 .25 J Work done in percentage 81.239/o ( as percentage of the estimated cost) 4. Balance Cost to be lncurred 2.37"23.998.75 ( based on Estimated Cost ) 5 Cost Incurred on Additionall Extra items not included in the Estimated Cost (Table C) NIL TABLE B lnternal& External Development Works in Respect of the Registration Phase Sr. Particular Amount No. I Total Estimated Cost of the fnternal and External Development Works including 2,52.84,000.00 amenities and Facilities in the layout as on date of Registration is WANKHADE Consulting Structural Engineer (8.E. CtvtL, M.E. STRUCTURE) Engineering Council of lndia Reg.No.APElA0074t16 2. Cost incurred as on date of certificate NIL J Work done in percentage NIL ( as percentage of the estimated cost) 4 Balance Cost to be lncurred 2.52.84,000.00 ( based on Estimated Cost ) 5 Cost Incurred on Additional/ Extra items not included in the Estimated Cost (Table C) NIL Yours Faithfully, Er. WANKHADE (Licence No. APE/00O74116) if any Signature & Name of Engineer Agreed and Accepted by: AMBER BTIILDERS & DEYELOPERS Promoter's Signature & Name For Ambar Builders & Developero 1) SMT. SEEMA SANJAY RATHI @ ForAmbarBullders&DaveloPers \ p.s ^V,eY|- \ mma- 2) SHRr. PRAKAST{ S. KELA Date: 07.01.2025 Note: l. The scope of the work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of Sale. T 2. (*) Quantity Survey can be done by office ofthe Engineerorcan be done by an independent quantity suryeyor being appointed by Developer. the name has to be mentioned at the place marked (*) and in case quantity are being calculated by ofhce of Engineer. The name of the person in the office of Engineer, who is responsible for the quantity calculated. should be mentioned at the place marked (*). 3. (* *) Balance Cost to be incurred (4) may vary fiom Difference between Total Estimated Cost ( I ) and actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred/to be incurred" 5. All Components of work with specifications are indicative and not exhaustive. 6. Please specifu if there are any deviations/qualifications. Example: Any Deviations in input material used from specifications in agreement of Sale. TABLE C List of Extra/AdditionahDeleted ltems considered in Cost (Which were not part of the original Estimate of the Total Cost) Sr. No. List of Ex*a'AdditionaliDeleted ltems Amount (Rs.) I ',, R WANK}IADE Consulting Structural Engineer (8.E. ClvlL, M.E. STRUCTURE) Engineering Council of lndia Reg.No.APEr00074/16