PLOT ]{O 44 SHly I|AOAR NAttDAttl,AIil, NAGPI',R -440000 aagarw.ntliadaoi @g![all.@rti f- AGIOOGaAOO3 Date:07.04.2021 To, AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA. AMRAVATI. Subject: Certificate of cost incumed for Development of AMBER PARK having Maha RERA Registration Number P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAI(ASH S. KELA, AUIRAVATI. Sir, 1 I Er. SAGAR WAIIKIIAIIE have undertaken assignment of certifying Estimated cost for AMBER PARK having Maha RERA Registration Number P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, THROUGH PARTI{ERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASII S. KELA, AMRAVATI. 2. We have estimated the cost of the completion of the civil, MEP and Allied works required for completion of internal & external works of the project as per the specifications mentioned in agreement of Sale. Our estimated cost calculations are based on the drawings/plans made available to us for the project under reference by the Developer/Consultants. The Schedule of items and quantiry- required for the entire work as calculated by Er. Sagar Wankhade Quantity Surveyor appointed by Developer/Engineer. The assumption of the cost of material, labour and other inputs made by Developer and the site inspection carried out by us to ascertain/confirm the above analysis given by us. 3. We estimate Total Estimated cost of completion of the aforesaid project under reference at Rs.12,64,20,000.00 (Total of Table A and B) at the time of Registration. The estimated Total cost of project is with reference to the Civil, MEP and Allied Works required for completion of the apartments and proportionate completion of internal & eternal works. As per specifications mentioned in agreement of Sale and for the purpose of obtaining occupation/completion certificate for the building(s)/Wing(s)/Layout/Plotted Development from the Town Planning Department, Amravati Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The estimated cost incurred till 31.03.2021 is calculated at Rs. 1,21,25,871.25 (Total of Table A and B). The amount of Estimated Cost Incurred is calculated on the base of input materials/services used and unit cost of these items. SAG ANKHADE Consulting Structural Engineer (8.E. CtVlL, M.E. STRUCTURE) Engineering Council of lndia Reg.No.APE/00074/16 5. The Balance cost of completion of the Civil, MEP and Allied works for the completion of the apartments and proportionate completion of intemal &, external works, as per specifications mentioned in agreement of Sale, of the Project is estimated at Rs. 11,42,94,128.75 (Total of Table A and B). 6. I clarifo that the cost of the Civil, MEP and allied work lbr the apaftments and proportionate internal & external works, as p6r specifications mentioned in agreement of Sale, of the aforesaid Project as completed on the date of this certificate is given in Table A and B below: TABLE A Building/ Wing /Layout/Plotted Development bearing Number "{!1fBElLry or called BUILDING NO.2 WING C & D (to be prepared separately for each B u i ld i n g/W :r:rg/L ay out/Plotted Developm ent of the Real Estate Proj ect) Sr. No. Particulars Amount (In RsJ I Total Estimated Cost of the buildingi wing/Layout/Plotted Development as on date 12,64.20"000.00 of Registration is 2 Cost incurred as on date of this certificate 1,21,25.871.25 a J Work done in percentage 9.590A ( as percentage ofthe estimated cost) 4 Balance Cost to be lncurred 11,42,94.128.75 ( based on Estimated Cost ) 5 Cost Incurred on Additionall Extra items not included in the Estimated Cost (Table C) NIL TABLB B lnternal & External Development Works in Respect of the Registration Phase Sr. Particular Amount No. I Total Estimated Cost of the Internal and Extemal Development Works including 2,52,84,000.00 amenities and Facilities in the layout as on date of Registration is SAG WANKHADE Consulting Structural Engineer (8.E. CtVtL, M.E. STRUCTURE) Engineering Council of tndia Reg.No.APE rc0074t16 2. Cost incurred as on date of certificate NIL J Work done in percentage NIL ( as percentage of the estimated cost) 4. Balance Cost to be Incurred 2,52,84,000.00 ( based on Estimated Cost ) 5. Cost Incurred on Additionall Extra items not NIL included in the Estimated Cost (Table C) Yours Faithfully, Er WANKHADE (Licence No. APE/00074116) if any Signature & Name of Engineer Agreed and Accepted by: AMBER BUILDERS & DEVELOPERS Promoter's Signature & Name For Ambar Builders & Developers Partner 1) SMT. SEEMA SANJAY RATrfr FonAmbar Bui!$ers & OevotoPers tS 2) SHRI. PRAKASH S. KELA Date:07.04.2021 Note: 1. The scope of the work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of Sale. 2. (*) Quantity Survey can be done by office ofthe Engineer or can be done by an independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by cffice of Engineer. The name of the person in the office of Engineer, who is responsible for the quantity calculated, should be mentioned at the place marked (*). 3. 1*+; Balance Cost to be incurred (4) may vary fiom Difference between Total Estimated Cost (l) and actual Cost incurred (2) due to deviation in quantrty required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred/to be incurred- 5. All Components of work with specifications are indicative and not exhaustive. 6. Please specify if there are any deviations/qualifications. Example: Any Deviations in input material used from specifications in agreement of Sale. TABLE C List of Extra/AdditionaVDeleted ltems considered in Cost (Which were not part of the original Estimate of the Total Cost) Sr. No. List of Extra/Additional/Deleted ltems Amount (Rs.) I ) WANKHADE