{ PLOT I{O 44 tsHlv I{AOIR ]{Af,DAI|YAN, ]tlAGPU]l.a4000e 3a9.rw.]lkh.d.Of (AgtI.tl.orn H- AGOiO6AAOOS Date: 07.10.2029 To, AMBER BUILDERS & DEVELOPERS, THROUCH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA. AMRAVATI. Subject: Certificate of cost incurred for Development of AMBER PARI( having Maha RERA Registration Number P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA, AMRAYATI. Sir, l. I Er. SAGAR WANKHADE have undertaken assignment of certifoing Estimated cost for AMBER PARK having Maha RERA Registration Number P50300024763 being developed by AlvlBER BUILIIERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASII S. KELA, AMRAVATL 2. We have estimated the cost of the completion of the civil, MEP and Allied works required for completion of internal & external works of the project as per the specifications mentioned in agreement of Sale. Our estimated cost calculations are based on the drawings/plans made available to us for the project under reference by the Developer/Consultants. The Schedule of items and quantity required for the entire work as calculated by Er. Sagar Wankhade Quantity Surveyor appointed by Developer/Engineer. The assumption of the cost of material, labour and other inputs made by Developer and the site inspection carried out by us to ascertain/confirm the above analysis given by us. 3. We estimate Total Estimated oost of completion of the aforesaid project under reference at Rs. 12,64,20,000.00 (Total of Table A and B) at the time of Registration. The estimated Total cost of project is with reference to the Civil, MEP and Allied Works required for completion & of the apartments and proportionate completion of internal eternal works. As per specifications mentioned in agreement of Sale and for the purpose of obtaining occupation/completion certificate fbr the building(s)/Wing(s)ilayoutlPlotted Development from the Town Planning Department, Amravati Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The estimated cost incurred till 30.09.2020 is calculated at Rs. 2234,010.00 (Total of Table A and B). The amount of Estimated Cost Incurued is calculated on the base of input materials/services used and unit cost of these items. SA R WANKHADE Consulting Structural Engineer (8.E. CtvlL, M.E. STRUCTURE) Engineering Council of lndia Reg.No.APE/00074/16 \ 5. The Balance cost of completion of the Civil, MEP and Allied works for the completion of the apartments and proportionate completion of intemal &, external works, as per specifications mentioned in agreement of sale, of the Project is estimated at Rs. 12,41,85,990.00 (Total of Table A and B). 6. I clarift that the cost of the Civil, MEP and allied work fbr the apartments and proportionate internal & external r4,orks, as per specifications mentioned in agreement of Sale, of the aforesaid Project as completed on the date of this certificate is in Table A -eiven and B below: TABLE A Building/ Wing /Layout/Plotted Development bearing Number *All[EER PABK or called BUILDING NO.2 WING C & D (to be prepared separately for each B ui I d i nglWing/ Lay outlPlotted Dev elopment of the Real Estate Proj ect) Sr. No. Particulars Amount (In Rs.) I Total Estimated Cost of the building/ wing/Layout/Plotted Development as on date 12,64,20,000.00 of Registration is 2 Cost incurred as on date of this certificate 22.34.010.00 3 Work done in percentage 1.77Yo ( as percentage of the estimated cost) 4 Balance Cost to be Incurred 12,41,85,990.00 ( based on Estimated Cost ) 5 Cost Incurred on Additional/ Extra items not included in the Estimated Cost (Table C) NIL TABLE B [nternal & Extemal Development Works in Respect of the Registration Phase Sr. Particular Amount No. I Total Estimated Cost of the lnternal and External Development Works including 2,52.84,000.00 amenities and Facilities in the layout as on date of Registration is WANKHADE Cons ultin g Structu ral E-qqi.ry1tr (8.8. Clvlf, M.E. STRUCTUF.E) i'rr';;1 Fn.,irr4erinc a,^ ''-:t ' E L 2. Cost incurred as on date of certificate NIL a J Work done in percentage NIL ( as percentage of the estimated cost) 4 Balance Cost to be Incurred 2.52.84.000.00 ( based on Estimated Cost ) 5 Cost Incurred on Additionall Extra items not included in the Estimated Cost (Table C) NIL Yours Faithfully, Er. WANKHADE SA (Licence No. APE/00074116) if any (8.E. Signature & Name of Engineer Agreed and Accepted by: AMBER BUILDERS & DEVELOPERS Promoter's Signature & Name & DeveloPers ForAmbar BuiHers @_ --Fartner 1) SMT. SEEMA SANJAY RATHr & DeveloPers ForAmbar Builders S. ? a. 2) SHRr. PRAKASH S. KELA Date:07.10.2020 Note: 1. The scope of the work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of Sale. \ 2. (*) Quantify Survey can be done by office ofthe Engineer or can be done by an independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer. The name of the person in the office of Engineer, who is responsible for the quantity calculated, should be mentioned at the place marked (*). 3. (**) Balance Cost to be incurred (4) may vary from Difference between Total Estimated Cost (l) and actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development ofthe Real Estate Project will result in amendment of the cost incurred/to be incurred- 5. All Components of work with specifications are indicative and not exhaustive. 6. Please specifo if there are any deviations/qualifications. Example: Any Deviations in input material used from specifications in agreement of Sale. TABLE C List of Extra/AddifionaVDeleted ltems considered in Cost (Which were not part of the original Estimate of the Total Cost) Sr. No. List of Extra/Additional,Deleted Items Amount (Rs.) I 2.