PLOT ilO 44 SHIY llAGAR ]{AIlDAllYAll, IIAGPUR -4.lo4'O/9 r.g.7w.r*Ir..Loi @gtrr.lI.Gorn [. aGOOlEaaOOS Datez 07.10.2021 To. A]VIBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRT. PRAKASH S. KELA, AMRAVATI. Subject: Certificate of cost incurred for Development of AI}IBER PARI( having Maha RERA Registration Nunber P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, THROUGH PARTI\TERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. IGLA, AMRAVATI. Sir, 1. I Br. SAGAR WANKIIADE have undertaken assignment of certifoing Estimated cost for AMBER PARK having Maha RERA Registration Number P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA, AMRAVATI. 2. We have estimated the cost of the completion of the civil, MEP and Allied works required for completion of internal & external works of the project as per the specifications mentioned in agreement of Sale. Our estimated cost calculations are based on the drawings/plans made available to us for the pro.ject under reference by the Developer/Consultants. The Schedule of items and quantity required for the entire work as calculated by Er. Sagar Wankhade Quantity Surveyor appointed by Developer/Engineer. The assumption of the cost of material, labour and other inputs made by Developer and the site inspection carried out by us to ascertain/confirm the above analysis given by us. 3. We estimate Total Estimated cost of completion of the aforesaid project under reference at Rs. 12,64,20,000.00 (Total of Table A and B) at the time of Registration. The estimated Total cost of project is with reference to the Civil, MEP and Allied Works required for completion of the apartments and proportionate completion of intemal & eternal works. As per speciflcations mentioned in agreement of Sale and for the purpose of obtaining occupation/completion certificate for the building(s)/Wing(s)/Layout/Plotted Development from the Town Planning Department, Amravati Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The estimated cost incurred till 30.09.2021 is calculated at Rs. 1,62,31,321^25 (Total of Table A and B). The amount of Estimated Cost Incurred is calculated on the base of input materials/services used and unit cost of these items. SAG WANKHADE Gonsulting Structural Engineer (B.E. ClvlL, M.E. STRUCTURE) Engineering Council of India Req i,lo.APE/00074/16 5. The Balance cost of completion of the Civil, MEP and Allied works for the completion of the apartments and proportionate completion of internal & external works, as per specifications mentioned in agreement of Sale, of the Project is estimated at Rs. 11,01,85,675.75 (Total of Table A and B). 6. I clarify that the cost of the Civil, MEP and allied work for the apartments and proportionate internal & external works, as per specifications mentioned in agreement of Sale, of the aforesaid Project as completed on the date of this certificate is given in Table A and B below: TABLE A Building/Wing/Layout/PlottedDevelopmentbearingNumber..4I1LEworca1led BUILDING NO.2 WING C & D (to be prepared separately for each Bu i I d i ng/W ing/ L ay out/ Plotted Deve lopm ent of the Real Estate Proj ect) Sr. No. Particulars Amount (In Rs.) 1 Total Estimated Cost of the buildingi wing/LayouVPlotted Development as on date 12,64,20,000.00 of Registration is 2. Cost incurred as on date of this certificate 1,62.31.321 .25 J Work dcne in percentage 12-84alo ( as percentage of the estimated cost) 4. Balance Cost to be Incurred I 1,01,88,678.75 ( based on Estimated Cost ) 5 Cost Incurred on Additional/ Extra items not included in the Estimated Cost (Table C) NIL TABLE B lnternal & External Development Works in Respect ofthe Registration Phase Sr. Particular Amount No. I Total Estimated Cost of the Internal and External Development Works including 2,52"84,000.00 amenities and Facilities in the layout as on date of Registration is SA WANKHADE Consulting Structural Eng ineer (8.E. CtVtL, M.E. STRUCTURE) Engineering Council of lndia Reg.No.APE IAAOTst'iA 2. Cost incurred as on date of certificate NIL Work done in percentage NIL ( as percentage ofthe estimated cost) 4 Balance Cost to be Incurred 2.52.84,000.00 ( based on Estimated Cost ) 5 Cost Incurred on Additionall Extra items not included in the Estimated Cost (Table C) NIL Yours Faithfully, Er WANKHADE (Licence No. APE/00074116) if any Signature & Name of Engineer Agreed and Accepted by: AMBER BUILDERS & DEVELOPERS Promoter's Signature & Name ForAmbar Builders & Developers 4Y- Partner 1) SMT. SEEMA SANJAY RATHr For Ambir Builders & Devetopers S' 2) SHRr. PRAKASIT S. t r(ELA :")^r -. I Date:07.10.2021 Note: 1. The scope of the work is to complete Registered Real Estate Project as per drawings approved fronr time to time and as per specifications mentioned in agreement of Sale. 2. (*) Quantity Survey can be done by office ofthe Engineer or can be done by an independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer. The name of the person in the office of Engineer, who is responsible for the quantity calculated, should be mentioned at the place marked (*). 3. (**) Balance Cost to be incurred (4) may vary from Difference between Total Estimated Cost (l) and actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quanti6, required for development of the Real Estate Project will result in amendment of the cost incurred/to be incurred. 5. AII Cornponents of work with specifications are indicative and not exhaustive. 6. Please specify if there are any deviations/qualifications. Example: Any Deviations in input material used from specifications in agreement of Sale. TABLE C List of Extra/AdditionaUDeleted ltems considered in Cost (Which were not part of the original Estimate of the Total Cost) Sr. No. List of ExtralAdditional/Deleted Items Amount (Rs.) I 2. SA WANKHADE _C_o1sq[!in g Structu ra I En g i nee r (8.8. CtvtL, M.E. STRUCT-URE) Engineering Councit of lndia Reg.No.APE t00074t16