PLOT ]IO .T4 SHIY I{AOAR ]l+I{DAIll,AIl, llAGPlrR -440009 sagarruarffradaol @gtrr-ll.orrr r. A6OOltOalOOs Date: 07.10.2022 To, A|UBER BUTLDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHT & SHzu. PRAKASH S. KELA. AMRAVATI. Subject: Certificate of cost incurred for Developrnent of AIi{BER PAAI( having Maha RERA Registation Number P503O0024763 being developed by AIIIBEI, BITILI}ERS & DEVELOPERS, TI{ROUGH PARTNERS SMT. SEEMA SA}IJAY RATm & SHRI. PRAKASH S. rGLA" AMRAYATT. Sir. 1. I Er. SAGAR WANKIIADE have undertaken assignment of certifying Estimated cost for AMBER PARI( having Maha RERA Registration Number P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATI{I & SHRI. PRAKASII S.I(ELA, AMRAVATI. 2. We have estimated the cost of the completion of the civil, MEP and Allied works required for completion of internal & external works of the project as per the specifications mentioned in agreement of Sale. Our estimated cost calculations are based on the drawings/plans made available to us for the project under reference by the Developer/Consultants. The Schedule of items and quantity required for the entire work as calculated by Er. Sagar Wankhade Quantity Surveyor appointed by DeveloperiEngineer. The assumption of the cost of material, labour and other inputs made by Developer and the site inspection carried out by us to ascertain/confirm the above analysis given by us. 3. We estimate Total Estimated cost of completion of the aforesaid project under reference at Rs. 12,64,20,000.00 (Total of Table A and B) at the time of Registration. The estimated Total cost of project is with reference to the Civil, MEP and Allied Works required for completion of the apartments and proportionate completion of internal & etemal works. As per specifications mentioned in agreement of Sale and for the purpose of obtaining occupation/completion certificate for the building(s)iWing(s)/Layout/Plotted Development frorn the Town Planning Department. Amravati Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implernenteri. 4. The estimated cost incurred till 30.09.2$22 is calculated at Rs. 4,19,81,882.25 (Total of Table A and B). The amount of Estimated Cost Incumed is calculated on the base of input materialslservices used and unit cost of these items. R WANKI.IADE Gonsplting Structural Engineer (8.E. CtVtL, M.E. STRUCTURE) Engineering Councll of lndia Reg.No.APE/00074/16 5. The Balance cost of completion of the Civil, MEP and Allied works for the completion of the apartments and proportionate completion of internal &, external works, as per specifications mentioned in agreement of Sale, ofthe Project is estimated at Rs. 8,44*38,117.75 (Total of Table A and B). 6. I clari& that the cost of the Civil, MEP and allied work for the apartments and proportionate internal & external works, as psr specifications mentioned in agreement of Sale, of the aforesaid Project as completed on the date of this certificate is given in Table A and B below: TABLE A Buildingl Wing /Layout/Plotted Development bearing Number. "ryEqLry or called BUILDING NO.2 WING C & D (to be prepared separately for each B u il d i n g/Wing/Layout/Plotted Deve lopment of the Real Estate Proj ect) Sr. No. Particulars Amount On Rs.) l. Total Estimated Cost of the building/ wing/Layout/Plotted Development as on date I2,64,20,000.00 of Registration is 2 Cost incurred as on date of this certificate 4,19,81,882.25 J Work done in percentage 33,21% ( as percentage of the estimated cost) 4. Balance Cost to be lncurred 8,44,38,117.75 ( based on Estimated Cost ) 5 Cost Incured on Additional/ Extra items not included in the Estimated Cost (Table C) NIL TABLE B Internal & External Development Works in Respect ofthe Registration Phase Sr. Particular Amount No. 1 Total Estimaled Cost of the lntemal and External Development Works including 2,52,84.000.00 amenities and Facilities in the layout as on date of Registration is / SAG{R :'r.....' Consulting Structr:ral Engineer (8.E. CtvtL, M.E. STRUCTURE) Engineering Council of lndia Reg.No.APEl00A74116 2 Cost incurred as on date of certificate NIL a Work done in percentage NIL ( as percentage of the estimated cost) 4. Balance Cost to be Incurred 2.52,84.000.00 ( based on Estimated Cost ) 5 Cost lncurred on Additionall Extra items nct included in the Estimated Cost (Table C) NIL Yours Faithfully, Er WANKHADE (Licence No. APE/00074116) if any, WANKHADE Cons ulting Structural Engineer (8.E. crvtL, M.E. STRUCTU RE) Signature & Name of Engineer Engineering Counci lof lndia Reg.No.APE t0OO74t16 Agreed and Accepted by: AMBER BUILDERS & I}EVELOPERS Promoter's Signature & Name i:; ",1 -..,.: I :.,i Builders & Developdte ?attnf I) SMT. SEEMA SANJAY RATIII For Ambar Bullders & DeveloPers s. t. Partne. 2) SrrRr. PRAKASH S. KELA Date:07.14.2022 Note: 1. The scope of the work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of Sale. 2. (*) Quantify Survey can be done by office ofthe Engineer or can be done by an independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer. The name of the person in the office of Engineer. who is responsible for the quantity calculated, should be mentioned at the place marked (+). 3. (**) Balance Cost to be incurred (4) may vary from Difference between Total Estimated Cost (l) and actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred/to be incurred. 5. All Components of work with specifications are indicative and not exhaustive. 6. Please specifu if there are any deviations/qualifications. Example: Any Deviations in input material used from specifications in agreement of Sale. TABLE C List of ExtraiAdditionaVDeleted ltems considered in Cost (Which were not part of the original Estimate of the Total Cost) Sr. No. List of ExtratAdditionalrDeleted ltems Amount (Rs.) I ) SAG WANKHADE Consultin g Structural Enginee.r (8.E. CIVIL, M.E. STRUCTURE) Engineering Council of lndia Reg.No.APElO0074/16