PLOT ]l.O 44 SHIV ttAGAR I|ANDAI{VAiI, rAcPuR 440040 a.garwarrl(ltad.Ol @grrr.ll.cotrt [- lBrEOO6taOOS Date:47.fi.2023 To, AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA. AMRAVATI. Subject: Certificate of cost incurred for Development of AMBER PARJ( having Maha RERA Registration Number P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. I{ELA, AMRAVATL Sir, l. I Er. SAGAR WANKHADE have undertaken assignment of certi$ing Estimated cost for AMBER PARK having Maha RERA Registration Number P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, TIIROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SIIRI. PRAKASH S. KELA, AMRAVATI. 2. We have estimated the cost of the completion of the civil, MEP and Allied *,orks required for completion of internal & external works of the project as per the specifications mentioned in agreement of Sale. Our estimated cost calculations are based on the drarvings/plans made available to us for the project under reference by the Developer/Consultants. The Schedule of items and quantity required for the entire work as calculated by Er. Sagar Wankhade Quantity Surveyor appointed by Developer/Engineer. The assumption of the cost of material, labour and other inputs made by Developer and the site inspection carried out by us to ascertain/confirm the above analysis given by us. 3. We estimate Total Estimated cost of completion of the aforesaid project under reference at Rs. 12,64,20,000.00 (Total of Table A and B) at the time of Registration. The estimated Total cost of project is with reference to the Civil, MEP and Allied Works required for completion of the apartments and proportionate completion of internal & etemal works. As per specifications mentioned in agreement of Sale and for the purpose of obtaining occupation/completion certificate for the building(s)/Wing(s)ilayoutlPlotted Development frorn the Town Planning Department, Amravati Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The estimated cost incured till 30.09"2023 is calculated at Rs. 6,83,71,810.25 (Total of Table A and B). The amount of Estimated Cost Incurred is calculated on the base of input materials/services used and unit cost of these items. R WANKHADE Consulting Structural Engineer (8.8. CtVtL, M.E. STRUCTUREI Engineering Council of lndia Reg.No.AFEl0A074116 5. The Balance cost of completion of the Civil, MEP and Allied works for the completion of the apartments and proportionate completion of internal & external works, as per specifications mentioned in agreement of Sale, of the Project is estimated at Rs. 5,80,48,189.75 (Total of Table A and B). 6. I clarifu that the cost of the Civil, MEP and allied work for the apartments and proportionate internal & extemal works, as per specifications mentioned in agreement of Sale, of the aforesaid Project as completed on the date of this certificate is given in Table A and B below: TABLE A Building/ Wing /Layout/Plotted Development bearing Number "{@lR PARK" or called BUILDING NO.2 WING C & D (to be prepared separately for each B u i ld in g/W ingl Lay out/P lotted Deve lopment of the Real Estate Proj ect) Sr. No. Particulars Amount (In Rs.) 1 Total Estimated Cost of the building/ wing/Layout/Plotted Development as on date 12,64,20.000.00 of Registration is 2 Cost incurred as on date of this certificate 6,83,71,810.25 a J Work done in percentage -54.08% ( as percentage ofthe estimated cost) 4. Balance Cost to be Incurred 5,80,48.189.75 ( based on Estimated Cost ) 5 Cost Incurred on Additional/ Extra items not included in the Estimated Cost (Table C) NIL TABLE B Internal & External Development Works in Respect ofthe Registration Phase Sr. Particular Amount No. I Total Estimated Cost of the Internal and External Development Works including 2,52,84,000.00 amenities and Facilities in the layout as on date of Registration is 2. Cost incurred as on date of certificate NIL 3 Work done in percentage NIL ( as percentage of the estimated cost) 4 Balance Cost to be Incurred 2,52.84.000.00 ( based on Estimated Cost ) 5 Cost Incurred on Additional/ Extra items not NIL included in the Estimated Cost (Table C) Yours Faithfully, Er. WANKHADE (Licence No. APE/00074/16) if any WA N [{.E. Signature & Name of Engineer of lnciia Agreed and Accepted by: AMBER BUILDERS & DEVELOPERS Promoter's Signature & Name ForAmbarBullders & Developers * 1) SMT. SEEMA SANJAY RATTTI ForAmbar Builders & DevdoPers St 2) SHRI. PRAKASH S. KELA t- Date:07.10.2023 Note: l. The scope of the rvork is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of Sale . 2. (*) Quantity Survey can be done by office ofthe Engineer or can be done by an independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer. The name of the person in the office of Engineer, who is responsible for the quantity calculated, should be mentioned at the place marked (*). 3. (**) Balance Cost to be incurred (4) may vary from Difference between Total Estimated Cost (l) and actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development ofthe Real Estate Project will result in amendment of the cost incurred./to be incurred- 5. A11 Components of work with specifications are indicative and not exhaustive. 6. Please specifr if there are any deviations/qualifications. Example: Any Deviations in input material used from specifications in agreement of Sale. TABLE C List of Extra/Additional/Deleted ltems considered in Cost (Which were not part of the original Estimate of the Total Cost) Sr. No. List of ExtraAdditionaliDeleted ltems Amount (Rs.) I 2. SS, WANKHADE Consultinq Structu ral E ngincer (8.E. CUI[, M.E. STRUCTURE) Lnsineering Council of lndia Reg.tIo.RPer00074/16