*DESIGN PtUS* group AN ARCHITECTURAL CONSULTENCY SERVICES 02 ,Ritesh plaza , Swastika llagar, llayuate Square, Badnera Road , Amravati - 444605 Date: A710412023 To, AMBER BUILDERS & DEVELOPI,RS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA. AMRAVATI. Subject: Certificate of Percentage of Completion of Construction Work of AMBPR PARK having Maha RERA Registration Number P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHr & SHRr. PRAKASH S.I(ELA, AMRAVATT. Sir. I Ar. RAHUL FARKADE have undertaken assignment as Architect / Licensed Surveyor of certifting Percentage of Completion of Construction Work of ltuBER PARK Having Maha RERA Registration Number P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, TIIROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA, AMRAVATI. Based on Site inspection, with respect to Layout / each of the Building /Wing of the aforesaid Real Estate Project, I certifr that as on the date 31.03.2023 of this certificate, the Percentage of Work done for each of the building /wing of the Real Estate Project under Maha RERA is as per Table A here in below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. RAHUL FAR E B.Arch. cA / 20A7 TABLE _ A Layout/Building/Wing Number "AMBER PARK" BUILDING-2 WING C & D (to be prepared separately for each Layout/Building/Wing ofthe project) Sr. No. Task / Activity Percentage of actual work done (l) (2't (3) I Excavation 80% 2. Basements (if any) N.A. J Podiums (if any) N.A. 4. Plinth 8OYo 5 Stilt floor 9s% 6. Slabs of Super Structure. 45Yo 7 Intemal Walls. lnternal Plaster, Flooring, Doors and l0Yr Window's within FlatV Prernises 8. Sanitary Fittings within the FlatsiPremises, 00ot'a 9 Staircases, Lifts wells and Lobbies at each Floor level, 00% Overhead and Underground Water Tanks. 10. The external plumbing and extemal plaster, elevation. 0UYo completion of terraces with Waterproofing of the BuildinelWine. ll. Installation of lifts. water pumps, Fire Fighting Fittings and 00% equipment as per CFO NOC, Electrical fittings, mechanical equipment. Compliance to conditions of environment/CRz NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing. compound rvall and all other requirements as may be required to complete the project as per specifications in agreement of Sale. Any other activities. TABLE _B Common Areas (Internal and Extemal Development Works) in respect of the Registered Phase/Pro.lect Number Sr. Common Areas and Facilities, Proposed Percentage Details No. (Yes/No) ofactual work done (3) (4) (l) Q) (s) I Internal Roads & Footpaths YES 00% 2. Water Supply YES 00% a J Sewerage ( chamber, lines , YES A0o/o septic Tank, STP) 4. Strom Water Drains YES 00Yo 5 Landscaping & Tree Planting YES aao RAHUL E B.Arch. cA / 20av 1(.t. t 6. Skeet Lighting YES a8% 7. Community Buildings YES Wa 8. Treatment and disposal of YES 0$% sewage and sullage water. 9 Solid Waste management & YES a0% Disposal 10. Water conservation I YES a0% Rain water harvesting. 11 Energi, management YES 80Yo 12. Fire protection and fire safelv YES AAYy requirements. l3 Electrical meter roomo sub- YES 00% station. receiving station. 14. Others (option to Add more). N.A. N.A. Yours Faithfully'. RAHUL FAR B.Arch. '*r' -"^ AT. RAHUL FARKADE {[- icense No. CAl2001 I 40264) Architect's Signature & Name Agreed and Accepted by, A]I{BER BUILDERS & DEVELOPERS Promoter's Signature & Name For Amb$r BtuElrlers & Sevelopers 1) SMT. SEEMA SANJAY RATrrr @ Hamner For Arnbar Builders & Developers -g 2) SHRr. PRAKASTT S. KELA Date: 07.04.2023