*DESIGN PLI.IS' grouP AN ARCHTTECTURAL CONSULTENCY SERVICES 02 ,Ritesh plaza , Surastil€ llagar, lla*ate Squre, Ba*rera Road , Amravati - 444605 Date: 0710412027, To, AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA. AMRAVATI. Subject: Certificate of Percentage of Completion of Construction Work of AMBER PARK having Maha RERA Registration Number P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, THROUGH PARTIYERS SMT. SEEMA SANJAY RATIII & SHRI. PRAKASH S. KELA, AIVIRAVATI. Si{. I Ar. RAHUL f,'ARI(ADE have undertaken assignment as Architect / Licensed Surveyor of certifying Percentage of Completion of Construction Work of AIVIBER PARK Having Maha RERA Registration Number P50300024763 being developed by AwIBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SrrRr. PRAKASH S. KELA9 AMRAVATT. Based on Site inspection, with respect to Layout I each of the Building /Wing of the aforesaid Real Estate Project, I certiff that as on the date 31.03.2022 of this certificate, the Percentage of Work done for each of the building /wing of the Real Estate Project under Maha RERA is as per Table A here in below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. RAHUL FA E B.Arch. cA I 200 TABLE _ A Layout/Building/Wing Number '(AMBER PARK" BUILDING-2 WING C & D (to be prepared separately for each Layout/Building/Wing of the project) Sr. No. Task / Activity Percentage of actual work done (1) QI (3) I Excavation 80% 2. Basements (if any) N.A. 3 Podiums (if any) N.A. 4. Plinth 800/o 5 Stilt floor 6}Yo 6. Slabs of Super Structure 00% 7 Internal Walls, Internal Plaster, Flooring, Doors and 400 Windows within FlatV Premises 8. Sanitary Fittings within the Flats/Premises, 0OYa 9 Staircases, Lifts wells and Lobbies at each Floor level. 00v, Overhead and Underground Water Tanks. 10. The external plumbing and extemal plaster, elevation, 0\Yo cornpletion of terraces with Waterproofing of the Building/Wing. ll Installation of lifts, water pumps, Fire Fighting Fittings and AUYo equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environmentlcRz NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, compormd wall and all other requirements as may be required to complete the project as per specifications in agreement of Sale- Any other activities. TABLE _B Common Areas (lnternal and Extemal Development Works) in respect of the Registered Phase/Project Number Sr. Common Areas and Facilities, Proposed Percentage Details No. (YesAIo) of actual work done (1) (2) (3) (4) (s) i Internal Roads & Footpaths YES 009/o 2 Water Supply YES 00% J Sewerage ( chamber, lines , YES 00o/o septic Tank, STP) 4 Strom Water Drains YES 00Ya 5 Landscaping & Tree Planting YES OOo/" RAHUL FA B.Arch. eAt200 6. Street Lighting YES 00% 7 Community Buildings YES 00o/o 8. Treatment and disposal of YES 00Yo sewage and sullage water. 9. Solid Waste management & YES 0a% Disposal 10. Water conservation i YES 0a% Rain water harvesting. 11 Energy management YES 00Yo 12. Fire protection and fire safety YES 0AVo requirements. 13. Electrical meter room, sub- YES 00o/o station, receiving station. 14. Others (option to Add more)- N.A. N.A. Yours Faithfulll', E-T;i;W AT. RATIUL FARKADE (License No. CA/2007 I 40264) Architect's Signature & Name Agreed and Accepted by, AMBER BUILDERS & DEVELOPERS Promoter's Signature & N*?orAmbarBuilders & Developers 1) SMT. SEEMA SANJAY RATHI @ Partner &DevoloPers ForAmbarBuilders a- E. Pailner 2) SrrRr. PRAKASH S. KELA Date: 07.04.2022