''DESIGN PIUS'' group AN ARCHITECTURAL CONSULTENCY SERVICES 02,Ritesh plaza, Swastika Nagar, !{auate Square, Badnera Road, Amravati - 444605 Date:0710112025 To, AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA" AMRAVATI. Subject: Certificate of Percentage of Completion of Construction Work of AMBUR PARK havirrg Maha RERA Registration Number P50300024763 being developed b;,- AMBER BL}ILDERS & DEVELOPERS, THROUG}I PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA, AMRAYATI. Sir. I Ar. RAIIUL FARXADE have undertaken assignment as Architect / Licensed Surveyor of certitying Percentage of Cornpletion of Construction Work of AMBER PARK Having Maha RERA Registration Number P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATIII & SHRI. PRAKASH S. KELA, AMRAVATI. Based on Site inspection, rvith respect to Layout / each of the Building /Wing of the atbresaid Real Estate Project, t certify that as on the date 31.12.2024 of this certificate. the Percentage of Work done for each of the building /wing of the Real Estate Project under Maha RERA is as per Table A here in below, The percentage of the w'ork executed with respect to each of the activity ofthe entire phase is detailed in Table B. HUL FAR B"Arch. rAl cA / 2007 TABLE _ A Layout/BuildingiWing Number 6'AMBER PARK" BUILDING-2 WING C & D (to be prepared separately for each Layout/Building/Wing of the project) Sr. No. Task I Activity Percentage of actual work done (r) (21 (3) I Excavation 95% 2 Basements (if any) N.A. J Podiums (if any) N.A. 4 Plinth 9s% 5 Stilt floor 98% 6 Slabs of Super Structure 9\Yo 7 Internal Walls, Internal Plaster, Flooring, Doors and 8s% Windows within Flats/ Premises 8 Sanitary Fittings w'ithin the Flats/Premises- 500h 9 Staircases, Lifts wells and Lobbies at each Floor level. 30% Overhead and Underground Water Tanks. 10. The external plumbing and external plaster, elevation, 3s% completion of terraces u,ith Waterproofing of the Building/Wing. lt. Installation of lifts. water pumps, Fire Fighting Fittings and O0o/o equipment as per CFO NOC, Electrical tittings, mechanical equipment. Compliance to conditions of environmentlcRz NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing. compound wall and all other requirements as ma.v-. be required to complete the project as per specitications in agreement of Sale. Any other activities, TABLE -B Common Areas (lnternal and ExtemalDevelopment Works) in respect ofthe Registered Phase/Project Number Sr. Common Areas and Facilities, Proposed Percentage Details No. (Yes/No) of actual work done (2) (3) (4) (s) (1) I lntemal Roads & Footpaths YES 6A0/" 2 Water Supply YES 80% J Sewerage ( chamber, lines , YES 70% septic Tank, STP) 4 Strom Water Drains YES 80% 5 Landscaping & Tree Planting YES 9s% RAHUL FA RKADE B.Arch. L cA / 200 6. Street Lighting YES 70% 7 Community Buildings YES 9OYo I Treatment and disposal of YES 5Ao/o sewage and sullage water- I Solid Waste management & YES a0% Disposal 10. Water conservation / YES 9$Yo Rain water harvesting. l1 Energy management YES AAo/" 12. Fire protection and fire safety YES 3s%o requirements. 13 Electrical meter room, sub- YES 5Ao/o station, receiving station. 14. Others (option to Add more). N.A. N.A. Yours Faithfully, Eilfffri'-l-# AT. RAHUL FARKADE (License No. CAl2007 I 40264) Architect's Signature & Name Agreed and Accepted b1,. AMBER BUILDERS & DEVELOPERS Promoter's Signature & Name For Ambar Builders & DeveloFers ,% 1) SMT. SEEMA SANJAY RATr{r ForAmhar Builders & Devdopers 2) SHRr. PRAKASH S. KELA t g" Pa er Date: 07 -01.2025