r- *DESIGN PtUS* grouP AN ARCHITECTURAL CONSULTENCY SERVICES 02 ,Ritesh plaza , Svyastils ilagar, Namte Square, Badnera Road , Antmvati - {446ffi Date: 07/01/2024 To, AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI, PRAKASH S. KE,LA, AMRAVATI. Subject: Certificate of Percentage of Completion of Construction Work of afUnnR PARK having Maha RERA Registration Number P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, THROUGII PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA, AMRAVATI. Sir. I Ar. RAHUL FARKADB have undertaken assignment as Architect / Licensed Surveyor of certifuing Percentage of Completion of Construction Work of aMStn PARK Having Maha RERA Registration Number P50300024763 being developed by AMBER BIILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATIII & SHRI. PRAKASH S" KELA, AMRAVATI. Based on Site inspection, with respect to Layout / each of the Building /Wing of the aforesaid Real Estate Project, I certiff that as on the date 3L.12.2023 of this certificate, the Percentage of Work done for each of the building /wing of the Real Estate Project under Maha RERA is as per Table A here in below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. 5*H',^mff;;,t cA / 2007 wAZAn. TABLE _ A Layout/Building/Wing Number '6AMBERPARK" BUILDING-2 WING C & D (to be prepared separately for each Layout/Building/Wing of the project) Sr. No. Taski Activity Percentage of actual work done (1) (2\ (3) 1 Excavation 80% 2, Basements (if any) N.A. J Podiums (if any) N.A. 4 Plinth 8A% 5 Stilt floor 9s% 6. Slabs of Super Structure. 80% 7 Internal Walls. Intemal Plaster, Flooring, Doors and 25Ya Windows within Flats/ Premises 8. Sanitary Fittings within the Flats/Premises. a0% 9 Staircases, Lifts wells and Lobbies at each Floor level, 000 Overhead and Underground Water Tanks. 10. The external plumbing and extemal plaster, elevation, a0% completion of terraces with Waterprocfing of the Building/Wing. 1l Installation of lifts. water pumps, Fire Fighting Fittings and 0jYo equipment as per CFO NOC. Electrical fittings, mechanical equipment, Compliance to conditions of environment/CRz NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing. compound wall and all other requirements as may be required to complete the project as per specifications in agreement of Sale- Any other activities. TABLE _B Common Areas (Internal and External Development Works) in respect ofthe Registered Phase/Project Number Sr. Common Areas and Facilities, Proposed Percentage Details Fio. (Yes/No) of actual work done (1) (2) (3) (4) (s) 1 Internal Roads & Footpaths YES 0a% 2. Water Supply YES 000/0 J Sewerage ( chamber, lines , YES 80Yo septic Tank- STP) 4. Strom Water Drains YES 0a% 5 Landscaping & Tree Planting YES 004/o RAHUL FA B.Arch. cA I 2A0 AR !1 6 Street Lighting YES 08Yo 7 Community Buildings YES A0t/o 8. Treatment and disposal of YES a00/, sewage and sullage water. 9 Solid Waste management & YES 0a% Disposal 10. Water conservation / YES A$Yo Rain water harvesting. l1 Energy management YES OAYI t2. Fire protection and fire safety YES $AYo requirements. 13 Electrical meter room, sub- YES oao station, receiving station. 14. Others (option to Add more). N.A, N.A. Yours Faithfully, E*Y,:rxlffi cA / wzfi4' 2007 Ar. RAIfUL FARKADE (License No. CAl2001 /40264) Architect's Signature & Name Agreed and Accepted by. AMBER BUILDERS & DEVELOPERS Promoter's Signature & Name ForAmbarBullders & Developers 1) SMT. SEEMA SANJAY RATrrr @Partne' ForAmbarBuilders & Developers 1 2) SHRr. PRAKASIT S. KELA ?'nd#ltq Date:07.01.2024