*DESIGN PIUS* grorrP AN ARCHITECTURAL CONSULTENCY SERVICES 02,Ritesh plaza , Swastika Nagar, Haruate Square, &dnera Road , Amravati - ,1,1,1605 Date:4710112023 To, AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA, AMRAVATI. Subject: Certificate of Percentage of Completion of Construction Work of nmnnR PARK having Maha RERA Registration Number P50300024763 being developed by AIVIBER BUILDERS & DEVELOPERS, THROUGTI PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA, A}IRAVATI. Sir, I Ar. RAHUL FARKADE have undertaken assignment as Architect / Licensed Surveyor of certif;,ing Percentage of Completion of Construction Work of A]Vtnsn PARK Having Maha RERA Registration Number P50300024763 being developed by AMBER BUILDERS & DE\'ELOPERS, TIIROUGH PARTNERS SMT. SEEMA SANJAY RATIII & SHRI. PRAKASH S. KELA, AMRAVATI. Based on Site inspection, with respect to Layout / each of the Building /Wing of the aforesaid Real Estate Project, I certifu that as on the date 31.12.2022 of this certificate, the Percentage of Work done for each of the building /wing of the Real Estate Project under Maha RERA is as per Table A here in below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. RAHUL FA DE B.Arch. cA / 2007 %fr4. TABLE _ A f.ayout/Building/Wing Number "A]IBER PARK" BUILDTNG-2 wrNG c & D (ro be prepared separately for each Layout/Building/Wing of the project) Sr. No. Task I Activitv Percentage of actual work done (1) (2\ (3) 1 Excavation 80% 2 Basements (if any) N.A. J Podiums (if any) N.A. 4 Plinth 80Ya 5 Stilt floor 950 6. Slabs of Super Structure. 3596 7 Internal Walls. lnternal Plaster- Flooring, Doors and 00o/o Windows within Flats/ Premises 8. Sanitary F ifti ngs rv ithin the Flats/Premises, aa% 9 Staircases, Lifts wells and Lobbies at each Floar level. 00% Overhead and Underground Water Tanks. 10. The external plurnbing and extemal plaster, elevation. 00% completion of terraces rri,'ith Waterproofing of the Building/Wing. 11 Installation of lifts. \vatsr purnps, Fire Fighting Fittings and AAYy equipment as per CFO NOC, Electrical fittings. mechanical equipment, Compliance to conditions of environmentlcRz NOC, Finishing to entrirnce lotrbl'/s, plinth protection, paving of areas appurtenant to BuildingiWing, compound wall and all other requirements as ma)- be required to complete the project as per specifications in agreement of Sale. Any other activities. TABLE -B Common Areas (Internal and External Development Works) in respect of the Registered Phase/Project Number Sr. Common Areas a*d Facilities, Proposed Percentrge Details No. (Yes/No) ofactual work done (1) (2) (3) (4) (s) 1 Internal Roads & Footpaths YES Oao ?. Water Supply YES 00o/o J Sewerage ( chamber. lines , YES 0Ao/o septic Tank. STP) 4 Strom Water Drains }.ES 00% 5 Landscaping & Tree Planting YES aa% R.AHU L FAR B.Arch. cA / 2007 '0jr 6. Street Lighting YES 00% 7 Community Buildings YES AOYI 8. Treatment and disposal of YES $AY" sewage and sullage water. 9 Solid Waste managernent & YES 00Ys Disposal 10. Water conservation / YES 00% Rain water harvesting. l1 Energy management YES A$Yo 12. Fire protection and fire safetv YES 0a% requirements. 13. Electrical meter room, sub- YES AOYy station, receiving station. 14. Others (option to Add more). N.A. N.A. Yours Faithfulll'. RAHUL FAR B.Arch. cA / 2007 AT. RAIIUL FARKADE (License No. CAl2007 l4A264J Architect's Signature & Name Agreed and Accepted by, AMBER BUILDERS & DEVELOPERS Promoter's Signature & Name ForAmbar Builders & DevolgPers 1) SMT. SEEMA SANJAY RATIII 4y_ fartner ForAmbar Builders &OeveloPers 2) SHRr. PRAKASH S. KELA f .8, Partner Date: 07.01.2023