''DESIGN PTUSO - groul} AN ARCHITECTURAL CONSULTENGY SERVICES 02 ,Ritesh plaza , Swastika l,lagar, llaruate Square , Badnera Road , Amravati - 'l,l'1605 Date:0710112022 To, AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA, AMRAVATI. Subject: Certificate of Percentage of Completion of Construction Work of lnnnnR PARK having Maha RERA Registration Number P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA, AMRAVATI. Sir, I Ar. RAIIUL FARKADE have undertaken assignment as Architect / Licensed Surveyor of certifying Percentage of Completion of Construction Work of AMBER PARK Having Maha RERA Registration Number P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEtrMA SANJAY RATHI & SHRI. PRAKASH S. KELA, A}IRAVATI. Based on Site inspection, with respect to Layout / each of the Building /Wing of the aforesaid Real Estate Project, I certify that as on the date 31.12.2021 of this certificate, the Percentage of Work done for each of the building /wing of the Real Estate Project under Maha RERA is as per Table A here in below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. RAHU!- FARKA B.Arch. cA / 20av TABLE _ A Layout/Building/Wing Number 66AMBER PARK" BUILDING-2 WING C & D (to be prepared separately for each Layout/Building/Wing ofthe project) Sr. No. Task / Activity Percentage of actual work done (1) (2' (3) 1 Exsavation 80% 2. Basements (if any) N.A J Podiums (if any) N.A 4. Plinth 70% 5 Stilt floor 100 6 Slabs of Super Structure 00% 7 Internal Walls. Intemal Plaster Flooring, Doors and 0Ao/o Windows within FlatV Premises 8 Sanitary Fifiings within the Flats/Premises a0% 9 Staircases, Lifts wells and Lobbies at each Floor level, 00010 Overhead and Underground Water Tanks. t0 The external plumbing and external plaster, elevation. a0% completion of terraces with Waterproofing of the Building/Wing. 11. Installation of lifts. water pumps, Fire Fighting Fittings and a0% equipment as per CFO NOC, Electrical fittings. mechanical equipment, Compliance to conditions of environment/CRz NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing. compound rvall and all other requirements as may be required to complete the project as per specifications in agreement of Sale. Any other activities. TABLE _B Common Areas (Internal and External Development Works) in respect ofthe Registered Phase/Project Number Sr. Common Areas and Facilities, Proposed Percentage Details No. (Yes/No) of actual work done (1) (2) (3) (4) (s) I Internal Roads & Footpaths YES 00% 2 Water Supply YES 000 3. Sewerage ( chamber, lines , YES 00o/a septic Tank, STP) 4 Strom Water Drains YES 0oa6 5. Landscaping & Tree Planting YES 00% RAHUL FA i, il F. B.Arch. cA I ZAAV 6. Street Lighting YES A0Yo 7 Community Buildings YES 00Yo 8. Treatment and disposal of YES oa% sewage and sullage water. 9 Solid Waste management & YES a0% Disposal 10 Water conservation / YES 00Yo Rain water harvesting. 11. Energy management YES 00o/o 12. Fire protection and fire safety YES 0Ao/o requirements. 13. Electrical meter room, sub- YES A0Ya station, receivins station. 14. Others (option to Add more). N.A. N.A. Yours Faithfully, ffi RAHUL FA B.Arch. cA / 2007 AT. RAHUL FARKADE (License No. CAl2007 I 40264) Architect's Signature & Name Agreed and Accepted by, AMBER BUILDERS & DEVELOPERS Promoter's Signature & Name For ffnbar Builders & Developers ,ouuDd JeuuBd Partner 1) SMT. SBEMA SANJAY RATIII rri rBquv JoJ For Ambar Builderc & Developers 2) SHRr. PRAKASH S. KELA r S er Date: 07.01.2022