c t! *DESIGN PLUS' + gnDrrl} AN ARCHITECTURAL CONSULTENCY SERVIGES 02 ,Ritesh plaza , Swastilo ilagar, l{auate Square, Badnem Road , Amravati - {4.1605 Date:0711012024 To, AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA. AMRAVATI. Sutrject: Certificate of Percentage of Completion of Construction Work of afrlgtrR PARI( having Maha RERA Registration Number P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, TIIROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S.I(ELAO AMRAVATI' Sir, I Ar. RAHUL FARKADE have undertaken assignment as Architect / Licensed Surveyor of certifring Percentage of Completion of Construction Work of lUnf,R PARK Having Maha RERA Registration Number P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, THROUGH PART}I-ERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA, AMRAVATI. Based on Site inspection, with respect to Layout / each of the Building lWing of the aforesaid Real Estate Project, I certifu that as on the date 30.09.2024 of this certificate, the Percentage of Work done for each of the building /wing of the Real Estate Project under Maha RERA is as per Table A here in below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. RAHUL tr: i; B.Arch. cA / 200 TABLE _ A Layout/'Building/Wing Number .'AMBER PARK" BUILDING-2 WING C & D (to be prepared separately for each Layout/Buitding/Wing of the project) Sr. No. Task I Activity Percentage of actual work done (1) (2\ (3) I Excavation 80% 2. Basements (if any) N.A. J Podiums (if any) N.A. 4. Plinth 80% 5 Stilt floor 95Yo 6 Slabs of Super Structure 9s% 7 Internal Walls. Internal Plaster, Flooring. Doors and 600h Windows within FlatV Premises 8 Sanitary Fittings within the Flats/Premises, 05o/o 9 Staircases. Lifts wells and Lobbies at each Floor level. a0% Overhead and Underground Water Tanks. l0 The external plumbing and external plaster, elevation, t5% completion of terraces with Waterproofing of the Building/Wing. lt Installation of lifts, water pumps, Fire Fighting Fittings and A0Yo equipment as per CFO NOC, Electrical fittings. mechanical equipment. Compliance to conditions of environment/CRz NOC, Finishing to entrance lobbyls, plinth protection, paving of areas appurtenant to Building/Wing, compound wall and all other requirements as may be required to complete the project as per specitications in agreement of Sale. Any other activities. TABLE _B Common Areas (Internal and External Development Works) in respect ofthe Registered Phase/Project Number Sr. Common Areas and Facilities, Proposed Percentage Details ItIo. (Yes/No) ofactual work done (l) (2) (3) (4) (s) I Internal Roads & Footpaths YES 25% 2. Water Supply YES 50o/" J Sewerage ( chamber, lines , YES 500/o septic Tank, STP) 4. Strom Water Drains YES 5j%o 5 Landscaping & Tree Planting YES 8Ao/o RAHUL F DE B.Arch. C.Al2A 6. Street Lighting YES t0% 7. Community Buildings YES 25o/o I Treatment and disposal of YES 259/o sewage and sullage water. 9 Solid Waste management & YES aa% Disposal r0. Water conservation / YES 25% Rain rvater harvesting. II Energ-v management YES a0nh 12" Fire protection and fire safef_v- YES 25o/a requirements. 13. Electrical rneter room, sub- YES 2A% station. receivinq station. 14. Others (option to Add more). N.A. N.A. Yours Faithfulll', RAHUL B.Arch. cA / 2AA7 Ar. RAHfIL FARKADE (License No. CA/2001 / 4A261) Architect's Signature & Name Agreed and Accepted by, AMBER BUILDERS & DEVELOPERS Promoter's Signature & Name ForA,.cber Buiitlere * op:f-.* 7^ tlNl U SMT. SEEMASAI\JAYRATIII W ForAmbar Builders & DeveloPers 8- 2) SHRr. PRAKASH S. KELA Date: 07.10.2024