*DESIGN PIUS'' gr(}up AN ARCHITECTURAL CONSULTENCY SERVICES 02,Ritesh plaza , Swastika Hagar Nawate Square , Eadnera Road , Amravati - 44.{605 Date:07fi4?022 To, AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATH] & SHRI. PRAKASH S. KELA, AMRAVATI. Sutrject: Certificate of Percentage of Completion of Construction Work of AMBER PARK having Maha RER-{ Registration Number P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, THROUGII PARTNERS SMT" SEEMA SANJAY RATHI & SHRI. PRAKASH S.I(ELA, AMRAVATI. Sir. I Ar. RAI{UL FARI(ADE have undertaken assignment as Architect / Licensed Surveyor of certifying Percentage of Completion of Construction Work of arureR PARK Having Maha RERA Registration Number P5030002,t763 being developed by AMBER BUILDERS & DEYELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASII S. KELA, AMRAVATI. Based on Site inspection, with respect to Layout / each of the Building iWing of the aforesaid Real Estate Project, I certify that as on the date 30.09.2022 of this certificate, the Percentage of Work done lbr each of the building /wing of the Real Estate Project under Maha RERA is as per Table A here in below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. RAHUL F AR B.Arch. ,!, I: i eA/ ?.* TABLE _ A Layout/Building/Wing Number 6(AIVIBER PARK" BUILDING-2 WING C & D (to be prepared separately for each Layout/Building/Wing ofthe project) Sr. No. Task/ Activity Percentage of actual work done (1) {2\ (3) 1 Excavation 80% 2. Basements (if any) N.A. a -) Podiums (if any) N.A. 4. Plinth 80o/a 5. Stilt floor 95Yo 6. Slabs of Super Structure 25Ya 7 Intemal Walls. Internal Plaster, Flooring, Doors and 00% Windows within Flats/ Premises 8 Sanitary Fittings within the Flats/Premises, 00% 9 Staircases, Lifts wells and Lobbies at each Floor level, 00% Overhead and Underground Water Tanks. 10. The extemal plumbing and extemal plaster, elevation, 00% completion of terraces with Waterproofing the of Buildine/Wing. 1l Installation of lifts. water pumps, Fire Fighting Fiftings and a0v, equipment as per CFO NOC, Electrical fittings. mechanical equipment, Compliance to conditions of environmentJcRz NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. compound rvall and all other requirements as may be required to complete the project as per specifications in agreement of Sale. Any other activities. TABLE _B Common Areas (Internal and External Development Works) in respect of the Registered Phase/Project Number Sr. Common Areas and Facilities, Proposed Percentage Details No. (Yesflrlo) ofactual work done Q\ (3) (4) (s) (1) 1 Internal Roads & Footpaths YES 00% 2 Water Supply YES 00e a 3 Sewerage ( chamber, lines , YES 00o/o septic Tank, STP) 4. Strom Water Drains YES 0Ao/o 5 Landscaping & Tree Ptranting YES 0OYa E RA HUL FA B.Arch ' nl?.f, cA / 200 6. Street Lighting YES 0Ao/o 7 Community Buildings YES 00Yo 8. Treatment and disposal of YES 0AYo sewage and sullage water. 9 Solid Waste management & YES 00o/o Disposal 10. Water conservation / YES 00% Rain water harvesting. 1l Energy management YES $AYo t2. Fire protection and fire safe,ty YES 00Yo requirements. l3 Electrical meter room, sub- YES aa% station, receiving station. 14. Others (option to Add more). N.A. N.A. Yours Faithfully', RAHUL FAR E B.Arch. AT. RAHUL FARKADE (License No. CA/2007 I 40264) Architect's Signature & Name Agreed and Accepted by, AUIBER BUILDERS & DEVELOPERS Promoter's Signature & Name 1) SMT. SEEMA SANJAY €e ForAmbar Builders & DeveloPers RATIII P-artner &OevebPers ForAmbar Builders 8. 2) SrrRr. PRAKASTT S. KELA t Date:07.10.2022