''DESIGN PIUS'' grctrP AN ARCHITECTURAL CONSULTENCY SERVICES 02 ,Ritesh plaza , Svrastika Nagar, Narvate Square , Badnera Road, Amravati - 444605 Date: 0711012021 To, AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA. AMRAVATI. Subject: Certificate of Percentage of Completion of Construction Work of AMenR PARK having Maha RERA Registration Number P50300024763 being developed b-v AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. I(BLA, AMRAVATI. Sir. I Ar. RAHUL FARKADE have undertaken assignment as Architect / Licensed Surveyor of certifying Percentage of Cornpletion of Construction Work of AMBER PARK Having Maha RERA Registration Number P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA, AMRAVATI. Based on Site inspection, with respect to Layout I each of the Building lWing of the afbresaid Real Estate Project, I certift that as on the date 30.09.2021 of this certificate. the Percentage of Work done for each of the building /wing of the Real Estate Pro-iect under Maha RERA is as per Table A here in belorv" The percentage of the r,vork executed with respect to each of the activity of the entire phase is detailed in Table B. RAHUL FA B.Arch. tll r eA / 200 TABLE _ A Layout/Building/Wing Number *AMBERPARK" BUILDING-2 WING C & D (to be prepared separately for each Layout/Building/Wing of the project) Sr. No. Task / Activity Percentage of actual work done (r) (2) (3) 1 Excavation 80% 2 Basements (if an"v) N.A. ., Podiums (if any) N.A" 4 Plinth 5A"h 5. Stilt floor 00% 6. Slabs of Super Structure. AlYo 7 Internal Walls, Intemal Plaster, Flooring, Doors and 0a% Windows within F'lat# Premises 8. Sanitary Fittings within the FlatslPremises. 00% 9 Staircases. Lifts wells and Lobtries at each Flocr level, 00% Overhead and Underground Water Tanks. 10 The extemal plumbing and extemal plaster. eievation, 00?i, completion of terraces rvith $/aterproofing of the Building/Wine. u lnstallation of lifts, water pumps, Fire Fighting Fittings and aa% equipment as per CFO NOC. Electrical fittings- mechanical equipment, Compliance to conditions of environrnent/CRZ NOC. Finishing to entrance lobby/s. plinth protection. paving of areas appurtenant to BuildinglWing. compound rvall and all other requirements as may be required to complete the project as per specifications in agreement of Sale. Anv other activities. TABLE _B Common Areas (lnternal and External Development Works) in respect of the Registered Phase/Project Number Sr. Common Areas and Facilities, Proposed Percentage Details No. (Yes/No) ofactual work done (1) (2) (3) (4) (s) 1 lntemal Roads & Footpaths YES 00% 2. Water Supply YE.S 000 Sew'erage ( chamber. lines , a J YES 000/o septic Tank. STP) 4. Strom Water Drains YES 00% 5 Landscaping & Tree Planting YES AOc/o RAHU L FAR B.Arch. cA / 200 d-ii)-t:l 6 Street Lighting YES aa% 7 Community Buildings YES AAt/" 8. Treatment and disposal of YES aa% sewage and sullage water. 9 Solid Waste management & YES 0a% Disposal 10. Water conservation / YES 0Ua/o Rain water harvesting. ll Energy management YES 00% 12. Fire protection and {ire safety YES aa% requirements. t3. Electrical meter room, sub- YES 00% station" receiving station. 14. Others (option to Add more). N.A. N.A. Yours Faithfulll'. F: RAHUL FAR !-- B.Arch. eA / 200v AT. RAHUL FARKADE (License No. CA/2007 I 40264) Architect's Signature & Narne Agreed and Accepted by, AMBER BUILDERS & DEVELOPf,RS Promoter's Signature & Name ForAmbarBuitden & Devdopers 1) SMT. SEEMA SANJAY RATHI @ Partner F*r *uniti*a ffi u i{deys,* Scur*iopers 2) SHRr. PRAKASH S. KELA ? "e"K Date: 07.10.2021