*DESIGN PLUS* gnouP AN ARCHITECTURAL CONSULTENCY SERUCES 02 ,Ritesh plaza , Swastika Nagar, ilawate Square, Badnera Road, Acnrayati - 444605 Date: 0711012020 To, AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA. AMRAVATI. Subject: Certificate of Percentage of Completion of Construction Work of AlVtnun PARK having Maha RERA Registration Number P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA, AMRAVATI. Sir, I Ar. RAHUL FARKADE have undertaken assignment as Architect / Licensed Surveyor of certifuing Percentage of Completion of Construction Work of AMBER PARK Having Maha RERA Registration Number P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, TIIROUGH PARTNERS SMT. SEEMA SANJAY RATIII & SHRI. PRAKASH S. KELA, AI{RAVATT. Based on Site inspection, with respect to Layout / each of the Building /Wing of the aforesaid Real Estate Project, I certify that as on the date 30.09.2020 of this certificate, the Percentage of Work done for each of the building /wing of the Real Estate Project under Maha RERA is as per Table A here in below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. RAHUL L. B.Arch. cA / 20A7 TABLE _ A Layout/Building/Wing Number 66AIVIBER PARK" BUILDING-2 WING C & D (to be prepared separately for each Layout/Building/Wing ofthe project) Sr. No. Task / Activity Percentage of actual work done (1) QI (3) I Excavation 35% 2. Basements (if any) N.A. J Podiums (if any) N.A. 4. Plinth 00% 5 Stilt floor 000h 6. Slabs of Super Structure. 00Ya 7 Internal Walls, Internal Plaster, Flooring, Doors and 00% Windows within Flats/ Premises 8 Sanitary Fittings within the Flats/Premises 00Y. 9 Staircases, Lifts wells and Lobbies at each Floor level, 00% Overhead and Underground Water Tanks. 10. The external ptumbing and extemal plaster, elevation, a0% completion of terraces with Waterproofing of the Buildine/Wine. ll Installation of lifts, water pumps, Fire Fighting Fittings and $AYo equipment as per CFO NOC, Electrical fittings. mechanical equipment, Compliance to conditions of environmentlcRz NOC. Finishing to entrance lobbyls, plinth protection, paving of areas appurtenant to Building/Wing, compound wall and all other requirements as may be required to complete the project as per specifications in agreement of Sale. Any other activities. TABLE _B Common Areas (lnternal and Extemal Development Works) in respect ofthe Registered Phase/Project Number Sr. Common Areas aud Facilities, Proposed Percentage Details No. (YeVNo) of actual work done (1) (2) (3) (4) (s) I Intemal Roads & Footpaths YES 00Ya 2 Water Supply YES 00% J Sewerage ( chamber, lines , YES A$o/a septic Tank, STP) 4 Strom Water Drains YES 000h 5 Landscaping & Tree Planting YES 004/o D RAHUL FA B.Arch' cA / 200 6 Street Lighting YES 00% 7. Communify Buildings YES A$Yo 8. Treatment and disposal of YES 00% sewage and sullage water. 9 Solid Waste management & YES a0% Disposal t0. Water conservation I YES 00% Rain water harvesting. 11 Energy management ].ES AAYy 12. Fire protection and fire safety YES 000h requirements. 13. Electrical meter room, sub- YES a0% station, receiving station. 14. Others (option to Add more). N.A. N.A. Yours Faithfulll'- RAHUL FAR B.Arch. cA / 20a7 I AT. RAHUL FARI(ADE {License No. CA/2001 I 40264) Architect's Signature & Name Agreed and Accepted by, AMBER BUILDERS & DEVELOPERS Promoter's Signature & Name ForAmbarBuilders & DevgloFers 1) SMT. SEEMA SANJAY RATIII 4Y Partner ForAmbar Builden & Developers 2) STIRI. PRAKASII S.I(ELA Date:07.10.2020