*[}ESIGN PLU$O G + grouP AN ARGHITECTURAL CONSULTENCY SERVICES 02 ,Ritesh plaza , $rastika ltlagar, Hawate Square, Badnera Road , Amravati - {44505 Date: 0710712024 To, AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KE,LA, AMRAVATI. Subject: Certificate of Percentage of Completion of Construction Work of AMBER PARK having Maha RERA Registration Number P50300024763 being developed by AMBER BUTLDERS & DE\TELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA, AMRAVATI. Sir. I Ar. Rdt{UL FARI(ADE have undertaken assignment as Architsct / Licensed Surveyor of certifying Percentage of Completion of Construction Work of ltungx PARK Having Maha RERA Registration Number P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA, AMRAVATT. Based on Site inspection, with respect to Layout I each of the Building /Wing of the aforesaid Real Estate Project, I certifu that as on the date 30.06.2024 of this certificate, the Percentage of Work done for each of the building /wing of the Real Estate Project under Maha RERA is as per Table A here in below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. RAHUL FA B.Arch. cA / 200 TABLE _ A La,vout/Building/Wing Number 6(AMBERPARK" BUILDING-2 WING C & D (to be prepared separately for each La1,'ouf/BuildinglWing of the project) Sr. No. Task / Activi{v Percentage of actual work done (1) (21 (3) I Excavation 80% 2. Basernents (if any) N.A. J Podiurns (if an,v) N.A. 4. Plinth EAoA 5 Stilt floor 95% 6. Slabs of Super Structure. 9596 Internal Walls, lnternal Plaster, Flooring, Doors and 45% Windows within Flats/ Premises 8 Sanitary Fittings *,ithin the FlatsPremises. 00% 9 Stairsases. Lifts wells and Lobbies at each Floor level. 0a% Overhead and Undersround Water Tanks. 10. The external plumbing and external plaster, elevation. a5% completion of terraces with Waterproofing of the BuildinelWine" 11 Installation of lifts. water pumps, Fire Fighting Fittings and aao/, equipment as per CFO NOC, Electricai fittings, mechanical equipment, Compliance to conditions of environmentlcRz NOC, Finishing to entrance lobbyls, plinth protection, paving of areas appurtenant to Building/Wing. compound rvall and all other requirements as may be required to complete the project as per specifications in agreement of Sale- Any other activities. TABLE -B Common Areas (Internal and External Development Works) in respect of the Registered Phase/Project Number Sr" Common Areas and Facilities, Proposed Percentage Details Nr. (YesfNo) ofactual w-ork done (1) a) (3) (4) (5) I {nternal Roads & Footpaths YES 0Ao/a 2 Water Suppl-v YE,S 009/o a J Sewerage { charnber. lines . YES a0% septic Tank. STP) * A Strorn Water Drains YES 0a% 5 Landscapirrg & Tree Planting YES 00% RAHUL FA DE B.Arch. 6. Street Lighting YES A0Yo 7 Communitv Buildings YES O0o/o 8. Treatment and disposal of YES 0a% sewage and sullage !\'ater. 9 Solid Waste management & YES 00o/o Disposal t0. Water conservation / YES 00% Rain water harvesting. 11. Energy management YES AAa/o 12. Fire protection and fire safetv' YES 0a% requirements. 13. Electrical meter room, sub- \TS AUYo station, receivinq station. 14. Others (option to Add more). N.A. N.A. Yours Faithfully'. RAHUL E B.Arch. r:.r. cA / 2007 1y:..\,., AT. RAHUL FARKADB (License No. CA/2007 I 40264) Architect's Signature & Name Agreed and Accepted b5., AMBER BUILDERS & DEVELOPERS Promoter's Signature & Name For Ambar Builders & Developers 1) SMT. SEEMA SANJAY RATIII €y.,-Partner For Ambar Builders & Developers S. 2) SrrRr. PRAKASTT S. KELA Date: A7-07.2024