I *IIESIGN PLUS' #* grorlP - AN ARCHITECTURAL CONSULTENCY SERVIGES 02 ,Ritesh plaza , Swastika Hagar, Nawate Square , Badnera Road, Amravati - 444605 Dater 07lS7l2021 To. AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA, AMRAVATI. Subject: Certificate of Percentage of Completion of Construction Work of AIVIBER PARK having Maha RERA Registration Number P5030002,1763 being developed by AMBER BUILDERS & DEVELOPERS, THROUGII PARTNERS SMT. SEEMA SANJAY RATTII & SHRI. PRAKASH S. KELA, AMRAVATI. Sir, I Ar. RAIIUL FARI(ADE have undertaken assignment as Architect / Licensed Surveyor of cer-tifuing Percentage of Completion of Construction Work of AMBER PARI( Having Maha RERA Registration Number P50300024763 being developed by AMBER BUILDERS & DEVELOPERS, THROUGH PARTNERS SMT. SEEMA SANJAY RATHI & SHRI. PRAKASH S. KELA, AMRAVATI. Based on Site inspection, with respect to Layout / each of the Building /Wing of the aforesaid Real Estate Project, I certify that as on the date 30.06.2021 of this certificate, the Percentage of Work done for each of the building /wing of the Real Estate Project under Maha RERA is as per Table A here in below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. RAHUL FA DE B.Arch. cA / 200 TABLE _ A Layout/Building/Wing Number 6'AMBERPARK" BUILDING-2 WING C & D (to be prepared separately for each Layout/Building/Wing of the proiect) Sr. No. Task / Activity Percentage of actual w-ork done (1) (2) (3) 1 Excavation 80% 2 Basements (if any) N.A. J Podiums (if any) N.A. 4. Plinth 30% 5 Stilt floor 00% 6. Slabs of Super Structure. A\Yo 7 Intemal Walls, Internal Plaster, Flooring, Doors and 0$o/o Windows within FlatV Premises 8. Sanitary Fittings within the Flats/Premises, A0o/o 9. Staircases, Lifts wells and Lobbies at each Floor level. 0aoh Overhead and Underground Water Tanks. 10. The extemal plumbing and extemal plaster, elevation, A0o/o completion of terraces with Waterproof,ng of the Buildine/Wing. ll Installation of lifts. water pumps, Fire Fighting Fittings and a0% equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environmentlcRz NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, compound wall and all other requirements as may be required to complete the project as per specifications in agreement of Sale- Any other activities. TABLE -B Common Areas (Internal and External Development Works) in respect of the Registered Phase/Project Number Sr. Common Areas and Facilities, Proposed Percentage Details No. (Yes/No) of actual work done (1) (2) (3) (4) (s) I Intemal Roads & Footpaths YES 00% 2 Water Supply YES 00o/o J Sewerage ( chamber, lines , YES A0o/a septic Tank, STP) 4. Strom Water Drains YES 00% 5 Landscaping & Tree Planting YES A0Yo RAHUL FA B.Arch. 6. Street Lighting YES AAo/o 7 Communit-v Buildings YES A0Ya 8 Treatment and disposal of YES 00o/o sewage and sullage water. 9. Solid Waste management & YES O0o/o Disposal 10. Water conservation / YES 00o/o Rain water harvesting. ll Energy managernent YES 00Ya 12. Fire protection and fire safety YES A0Ya requirements. 13. Electrical meter room, sub- YES aa% station, receiv ing station. 14. Others (option to Add more). N.A. N.A" Yours Faithfully, RAHUL FAR B.Arch. AT. RAHUL FARKADE (License No. CA/2007 I 40264\ Architect's Signature & Name Agreed and Accepted by, AMBER BUILDERS & DEVELOPERS Promoter's signature Hffi our Builders & Developers 1) SMT. SEEMA SANJAY RATIII @Y Partner .rrt. &. 2) SHRr. PRAKASIT S. KELA Date:07.07.2021