Annexure- B FORM-2 See Regulation 31| ENGINEER'S CERTIFICATE (To be submitted al the time of Registration or Ongoing Project and for withdrawal of Money from Designated Account- Project Wise) Date: 07/01/2023 To, The P.S. Associates, FFS- 27, Venus Plaza, Shegaon Naka square Amravati, 444603 Subject: Certificate of Cost Incurred for Development of GAJANAN PLAZA for Construction of 1 building(s_1 Wing(s) of the Phase (MahaRERA Registration Number P50300028882 situated on the Plot bearing C. N. No./CTS No./Survey No./ 5/3 Final Plot No. 1 demarcated by its boundaries (latitude and longitude of the end points) SERVICE ROAD to the North OTHER'S LAYOUT to the South APPROVED LAYOUT IN S.N. 5/4P to the East SHRI BARABDE FARM to the West of Division - Amravati, Village - Amravati, Taluka -Amravati, District - Amravati, PIN-444 604 admeasuring 1700 sq.mts. area being developed by P.S. ASSOCIATES. Sir, IMiss. Ankita Haridasji Bhombe have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being GAJANAN PLAZA Buildings Building(s)/_1 Wing(s) ofthe Phase situated on the plot NO. 1 bearing C. N. No./CTS No./Survey No.5/3 of Division -Amravati, Village - Amravati, Taluka - Aamravati District - Amravati, PIN-444 604 admeasuring 1700 sq. mts, area being developed by P.S. ASSOCIATES 1. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plants made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire works as calculated by Mr. Mahesh Vyawahare quantity Surveyor appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 2. We estimate Total Estimated Cost of completion of the building(s) Phase l of the aforesaid project under reference as Rs. 18,19,00,000/- (construction cost- Rs. 16,51,84,014/-). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be certificate for the certificate / completion of obtaining occupation under whose completed for the purpose the Planning Authority from the Amravati Municipal Corporation being building(s) implemented. jurisdictionthe aforesaid project is being date is calculated at Rs. 18,20,55,500/- (construction cost Rs. Cost Incurred till 3. The Estimated Cost Incurred is calculated on the base of amount of The amount of Estimated 16,50,55,500/-). Total Estimated Cost. Phase I of of the Civil, MEP and Allied works of the Building(s) 4. The Balance cost of Completion Certificate from AMC the subject project to obtain Occupation Certificate / Completion (planning Authority) is estimated at Rs. 0/- MEP and allied work for the aforesaid Project as completed on 5. I certify that the Cost of the Civil, in Table A Below the date of this certificate is as given TABLE-A Plaza Building/Wing bearing Number 1 Called Gajanan each Building / Wing of the Real Estate Project) (to be prepared separately for Particulars Amounts Sr.No. (3) (2) Total Estim ted cost of the building/wing as on date of Rs. 18,20,55,500/- certificate is Cost incurred as on 31/12/2022 (Based on the Estimated Rs.18,20,55,500/- cost) Work done in percentage (as Percentage of the estimated 100% cost) Rs. 0/- 4 Balance Cost to be incurred (Based on Estimated Cost) Cost Incurred on Additional/ Extra Items as on 7/1/2023 Rs. 0/- not included in the Estimated Cost (Table-C) TABLE B Phase Internal & External Development Works in Respect of the Registered Sr. No. Particulars Amount (ln Rs.) 1. Total Estimated Cost of the Internal and External Facilities Development Works including amenities and inthela out as on date of Registration is Cost incurred as on date of certificate 3. Work donein Percentage (as Percentage of the estimated 4. BalanceCost to be Incurred Based on Estimated Cost) in 5. Cost Incurred on Additional!Extra Items not included theEstimated cost (Table -C) Table C List of Extra/Additional/ Deleted Items considered in Cost (which were not part of the original Estimate of Total Cost) Sr. No. List of Extra/Additional/ Deleted Items Amount (In Rs,) 1. 2. Yours Faithfully, Signature & Name [ANKITA HARIDASJI BHOMBE] Bhomy ANKITA BHOMBE B.E(Civil) Consulting Civil Engineer Agreed and Accepted by: Signature of Promoter Name: Date: P.S. ASSOCIATES FF27, Vinus Plaza, Shegaon aka Aravati